flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Photographer creates time-lapse video of 1 WTC using 30,000 photos

Photographer creates time-lapse video of 1 WTC using 30,000 photos

The building has incorporated new security measures to protect it from an incident like the one that felled the first trade towers. 


By BD+C Staff  | August 25, 2014

Brooklyn-based photographer Benjamin Rosamund has created a thought-provoking time-lapse video of the construction of the One World Trade Center, the Daily Mail reports. Choosing from 30,000 photos that he took from the day construction began in 2006 to the day when construction was finished in 2012, Rosamund compressed 1,100 photos to create the two-minute video.  

The One World Trade Center is a controversial piece of architecture—a symbol of recovery after the 9/11 terrorist attacks, the tower was also stalled by many years of arguing between victims' family members and authorities. The completed building is part memorial, part commercial center and part transportation hub. 

The building has incorporated new security measures to protect it from an incident like the one that felled the first trade towers. The first 20 stories of the tower are windowless and made of concrete that can withstand the blast from a truck bomb. All glass is shatter-proof. And the stairs and elevator shafts have their own ventilation system—one staircase is has been reserved for emergency services only. 

Related Stories

Modular Building | Feb 16, 2020

On the West Coast, prefab gains ground for speedier construction

Gensler has been working with component supplier Clark Pacific on several projects.

AEC Tech | Feb 13, 2020

Exclusive research: Download the final report for BD+C's Giants 300 Technology and Innovation Study

This survey of 130 of the nation's largest architecture, engineering, and construction firms tracks the state of AEC technology adoption and innovation initiatives at the AEC Giants.

Office Buildings | Feb 11, 2020

Forget Class A: The opportunity is with Class B and C office properties

There’s money to be made in rehabbing Class B and Class C office buildings, according to a new ULI report.

Architects | Feb 6, 2020

NBBJ acquires immersive technology design studio ESI Design

NBBJ has acquired experience design studio ESI Design. The acquisition signals a new era where buildings will be transformed into immersive and interactive digital experiences that engage and delight.

Sponsored | HVAC | Feb 3, 2020

Reliable Building Systems Increase Net Operating Income by Retaining Tenants

Tenants increasingly expect a well-crafted property that feels unique, authentic, and comfortable—with technologically advanced systems and spaces that optimize performance and encourage collaboration and engagement. The following guidance will help owners and property managers keep tenants happy.

Architects | Jan 29, 2020

Frank Lloyd Wright’s architecture school is closing

The school was established in 1932.

Libraries | Jan 23, 2020

Information or community center: The next generation of libraries must be both

Are libraries still relevant in a digital world?

Green | Jan 10, 2020

How the new EC3 tool raises the bar on collective action

Nearly 50 AEC industry organizations partnered to develop the groundbreaking Embodied Carbon in Construction Calculator.

Architects | Jan 9, 2020

AIA selects recipients for the 2020 Regional & Urban Design Awards

The 2020 Regional & Urban Design program recognizes the best in urban design, regional and city planning and community development.

Building Technology | Jan 7, 2020

Tariff whiplash for bifacial solar modules

Bifacial solar systems offer many advantages over traditional systems.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021