flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

In Phoenix, a former motel transforms into a boutique hotel with a midcentury vibe

Hotel Facilities

In Phoenix, a former motel transforms into a boutique hotel with a midcentury vibe

The Egyptian Motor Hotel’s 48 guest rooms come with midcentury furnishings ranging from egg chairs to Bluetooth speakers that look like Marshall amplifiers.


By Novid Parsi, Contributing Editor | July 21, 2023
In Phoenix, a former motel transforms into The Egyptian Motor Hotel, a boutique hotel with a midcentury vibe
All photos courtesy The Egyptian Motor Hotel

In Phoenix, The Egyptian Motor Hotel, which first opened in 1952 and operated for decades as the Las Palmas Inn, has been transformed into a boutique hotel with a midcentury vibe. With its large neon sign now restored, the two-story, open-air hotel features Egyptian-themed murals and other artwork.

The design by EDI International repurposed the hotel’s triangular parking lot into a 400-person live entertainment venue that includes a music stage and bar, while keeping most of the original parking spaces. The hotel’s first-floor cabana areas and second-floor balconies all have views of the stage. An onsite Mexican restaurant, Chilte, now serves as the permanent home of a former pop-up.

The Egyptian includes 48 guest rooms adorned with retro furnishings, including Bluetooth speakers that look like Marshall amplifiers, pillows resembling VHS tapes, egg chairs, Magic 8 Balls, refrigerators, and coolers. The rooms’ wallpapers take inspiration from classic drink labels. The guest rooms have a king bed or bunk bed, dinette table, and smart TVs. In one room, the names of The Doors’ songs and album titles form the face of late lead singer Jim Morrison. And a fully remodeled 1960s Airstream serves as a private guestroom.

The Egyptian Motel Hotel, which opened earlier this year, operates under Best Western’s BW Signature Collection.

On the Building Team:
Design architect and architect of record: EDI International  
MEP engineer: IMEG Corp.
Structural engineer: PVE, LLC
General contractor: Western States General Contracting, LLC
Construction manager: PDL Enterprises 

 

Related Stories

Hotel Facilities | Jul 29, 2020

COVID-19 hasn’t put hotel construction or renovations on hold

Los Angeles tops five metros that accounted for 15% of the country’s pipeline.

Hotel Facilities | Jun 25, 2020

Restoration of 1930s El Paso hotel completes

The project represented a cross-collaboration of Cooper Carry’s Hospitality studio and The Johnson Studio at Cooper Carry.

Coronavirus | May 27, 2020

Clean is the new Green as U.S. hospitality sector inches closer to reopening

Three design firms share their takes on what will make customers more comfortable about returning.

Hotel Facilities | May 5, 2020

Video: Fresh ideas for converting idle hotel rooftops to amenity spaces

From fire pits to infinity pools to urban gardens, hotel design experts with Base4 offer smart ideas for making the most of hotel rooftop amenity spaces. 

Coronavirus | Apr 14, 2020

COVID-19 alert: Missouri’s first Alternate Care Facility ready for coronavirus patients

Missouri’s first Alternate Care Facility ready for coronavirus patients

Coronavirus | Apr 10, 2020

COVID-19: Converting existing hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients

COVID-19: Converting existing unused or underused hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients 

Wood | Apr 1, 2020

HDR will design a mass timber Ramada Hotel

The hotel will be located in Kelowna, British Columbia.  

Hotel Facilities | Mar 25, 2020

Chicago's new Sophy Hotel

Completed in 2018, the seven-story, 98-guest room hotel complements the local museums, cultural attractions, and University of Chicago campus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021