flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Perkins+Will achieves first Living Building Challenge Certification with Vancouver visitors center

Green

Perkins+Will achieves first Living Building Challenge Certification with Vancouver visitors center

The VanDusen Botanical Garden Visitor Centre was recognized for its use of healthy building materials, on-site renewable resources, and filtered rainwater to meet greywater requirements.


By Perkins+Will | May 23, 2016
Perkins+Will achieves first Living Building Challenge Certification with Vancouver visitors center

Inspired by an orchid, the VanDusen Botanical Garden Visitor Centre in Vancouver has curved walls and a floating roof. Image courtesy Perkins+Will. Click here to enlarge.

Perkins+Will announced that the VanDusen Botanical Garden Visitor Centre received Living Building Challenge (LBC) Petal Certification by the International Living Future Institute.

The certification is the most advanced measurement of sustainability in the built environment and recognizes projects in performance categories called Petals. The VanDusen Visitor Centre achieved certification in the categories of Site, Materials, Health and Beauty.

Located in Vancouver, British Columbia, the VanDusen Botanical Garden Visitor Centre was inspired by the form and natural systems of a native orchid. Representing undulating petals, the roof appears to float above the building’s curved walls and flows from a central oculus and into the surrounding landscape. A multi-disciplinary design team that included architects, engineers, landscape architects, and ecologists collaborated to integrate natural and human systems in order to restore and enhance the ecological integrity of the site.

The Visitor Centre achieved LEED Canada-NC 1.0 Platinum Certified by the Canada Green Building Council and was named “Most Sustainable Building of the Year” in 2014 by World Architecture News. The project’s many innovations include: the procurement of healthy building materials; the integration of on-site renewable resources, along with passive design strategies, to significantly reduce energy consumption; the use of filtered rainwater for the building’s greywater requirements; and the treatment of 100% of blackwater by an on-site bioreactor.

“Almost a decade ago the Vancouver Board of Parks and Recreation commissioned Perkins+Will to create a signature, green facility to serve as a model of sustainable building for the City of Vancouver, to reflect its goal of becoming the greenest city in the world by 2020, and to raise the profile of the garden, both locally and internationally,” says Danica Djurkovic, Director of Facilities Planning and Development, City of Vancouver. “I am proud to say this project has exceeded our expectations. Since its opening, the garden has experienced a 50% increase in visitors and revenue and the Visitor Centre has become one of the most iconic buildings in Vancouver and in Canada.”

The VanDusen Botanical Garden Visitor Centre is the first project in Vancouver to be Living Building Challenge Petal certified and is one of only a handful of projects registered in British Columbia.

The Building Team included: Perkins+Will (architect), Ledcor Construction (contractor), Fast + Epp (SE), Integral Group (ME, EE), and R.F. Binnie & Associates (CE).

Related Stories

Green | Oct 12, 2016

Acting as a giant air purifier, this tower could help solve China’s pollution problem

The 23-ft tall tower operates almost entirely on wind energy.

Codes and Standards | Oct 10, 2016

New sustainable landscape development and management credential launched

GBCI offered the first testing opportunity Oct. 3 at Greenbuild

Codes and Standards | Oct 6, 2016

Obama administration will spend $80 million for smart cities initiatives

The technology is targeted for climate, transportation, resiliency.

Lighting | Oct 6, 2016

Healthcare systems lighting their way to savings

There has been a rapid improvement and availability of LED products as primary light sources in most healthcare facility applications.

Green | Oct 6, 2016

AIA Report: Mixed results in design projects meeting 2030 Commitment targets

More buildings are meeting certain goals, but energy intensity reduction results have flat lined

Green | Oct 6, 2016

GBCI announces arc, a new technology organization to measure and compare green building performance

Arc is a platform that will allow any building to participate and immediately start measuring performance, make improvements, and benchmark against itself. 

Green | Oct 4, 2016

The Clear Orb is one of the shortlisted projects for 2016 Land Art Generator Initiative

Designed by Heerim Architects & Planners, The Clear Orb would produce just under 600 million gallons of clean water annually.

Sustainability | Oct 4, 2016

One World Trade Center officially awarded LEED Gold certification

The skyscraper received the certification despite a setback caused by Hurricane Sandy.

Industry Research | Oct 3, 2016

Structure Tone survey shows cost is still a major barrier to building green

Climate change, resilience and wellness are also growing concerns.

Sustainability | Oct 3, 2016

Gensler-designed auto dealership to become world’s first to reach net zero

Toyota of Corvallis has also joined a few other Toyota dealerships around the country to achieve LEED Platinum certification.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021