flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Perkins Eastman unveils Qatar mixed-use sports complex

Perkins Eastman unveils Qatar mixed-use sports complex

Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.


By By BD+C Staff | April 6, 2012
The complex was designed to meet the business and operational goals of a world-c
The complex was designed to meet the business and operational goals of a world-class sports and entertainment complex and contri

The New York office of Perkins Eastman and design-build contractor Al Khayyat Contracting & Trading EST joined with the Private Engineering Office of the Emir to celebrate the start of construction for the 210,210 sf Lekhwiya Sports Complex—a mixed-use sports venue that will be the home stadium for Qatar's premier football team, Lekhwiya Club.

The complex also will be used as a training site and home base for a guest team participating in the 2022 World Cup.

Designed in collaboration with ECG, Pieper Sports Facility Consulting, and Site Concepts International, the Lekhwiya Sports Complex will serve as an identifiable icon for the home club, while its mix of uses will provide for a variety of experiences for players, fans, and sponsors alike.

The complex was designed to meet the business and operational goals of a world-class sports and entertainment complex and contributes to the architectural vitality of Qatar's largest city and its growing reputation as the region's sports capital.

As part of a larger athletic development underway for the 2022 World Cup taking place in Doha, Qatar, the first phase of the Lekhwiya Sports Complex will include a 60,000-sf, 10,000-spectator football stadium, practice facilities, and training fields to be complete by August 2012. The second phase will include a 129,210-sf) 75-room hotel, mosque, multi-sport arena, and related amenities. BD+C

Related Stories

Contractors | Oct 5, 2022

Materials shortages, cost spikes throwing Design-Bid-Build process out of whack

The traditional Design-Bid-Build delivery process is under considerable stress this year as materials shortages and cost spikes are upending usual practices, according to a new report from JLL.

Green | Oct 5, 2022

In California, a public power provider’s new headquarters serves as a test case for an innovative microgrid and for reducing greenhouse gas emissions

Sonoma Clean Power (SCP), the public power provider for California’s Sonoma and Mendocino Counties, recently unveiled its new all-electric headquarters.

Contractors | Oct 4, 2022

Which comes first, the building or the cost estimate?

At the start of a project, don’t forget to establish financial parameters when you’re discussing the design and program. By establishing the costs up front, you can avoid the pitfalls that might derail your project and guarantee its lasting success.

Fire and Life Safety | Oct 4, 2022

Fire safety considerations for cantilevered buildings

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

| Oct 4, 2022

Rental property owners want access to utility usage data for whole properties

As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.

| Oct 4, 2022

In dire need of affordable housing, Aspen, Colo. will get a development that provides 277 affordable homes

A few miles from downtown Aspen, Colo., a development will provide 277 new affordable homes for an area experiencing a dire affordable housing crisis.

Green | Oct 3, 2022

California regulators move to ban gas heaters for existing buildings

California regulators voted unanimously recently on a series of measures that include a ban on the sale of natural gas-powered heating and hot water systems beginning in 2030.

| Oct 3, 2022

The College of the Holy Cross completes a $110 million performing arts center

In Worcester, Mass., a one-hour drive from Boston, the College of the Holy Cross has completed its $110 million Prior Performing Arts Center.

Resiliency | Sep 30, 2022

Designing buildings for wildfire defensibility

Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.

| Sep 30, 2022

Manley Spangler Smith Architects partners with PBK in strategic merger

Manley Spangler Smith Architects (MSSA), a Georgia-based, full-service architectural firm specializing in educational and municipal facilities, announced today a significant development aimed at increasing its capabilities, expertise, and suite of services. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021