The New York office of Perkins Eastman and design-build contractor Al Khayyat Contracting & Trading EST joined with the Private Engineering Office of the Emir to celebrate the start of construction for the 210,210 sf Lekhwiya Sports Complex—a mixed-use sports venue that will be the home stadium for Qatar's premier football team, Lekhwiya Club.
The complex also will be used as a training site and home base for a guest team participating in the 2022 World Cup.
Designed in collaboration with ECG, Pieper Sports Facility Consulting, and Site Concepts International, the Lekhwiya Sports Complex will serve as an identifiable icon for the home club, while its mix of uses will provide for a variety of experiences for players, fans, and sponsors alike.
The complex was designed to meet the business and operational goals of a world-class sports and entertainment complex and contributes to the architectural vitality of Qatar's largest city and its growing reputation as the region's sports capital.
As part of a larger athletic development underway for the 2022 World Cup taking place in Doha, Qatar, the first phase of the Lekhwiya Sports Complex will include a 60,000-sf, 10,000-spectator football stadium, practice facilities, and training fields to be complete by August 2012. The second phase will include a 129,210-sf) 75-room hotel, mosque, multi-sport arena, and related amenities. BD+C
Related Stories
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.
Codes and Standards | Apr 6, 2015
Industry groups petition for change order reform on federal projects
Nine design and construction associations ask for assurance that funds available for additional work.
High-rise Construction | Apr 6, 2015
Melbourne tower will light up depending on weather
The tower will be illuminated by 164-foot-tall beams of LED light based on weather updates from the Bureau of Meteorology.
BIM and Information Technology | Apr 3, 2015
French startup develops drone camera that overlays video with 3D images
The new drones can capture video and overlay the shot results with 3D images and augmented reality remotely.