flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Pepper Construction Group CEO J. David Pepper, 59, passes away

Contractors

Pepper Construction Group CEO J. David Pepper, 59, passes away

Pepper was a long-time leader of one of the largest Midwest general contractors who lived his life in service to others.


By Pepper Construction | December 30, 2019
Pepper Construction Group CEO J. David Pepper, 59, passes away

David Pepper led Pepper Construction from 2003.

    

J. David (Dave) Pepper, 59, passed away unexpectedly but peacefully on Saturday, December 28, 2019 at his home in Barrington, Illinois. He was born in Evanston on January 15, 1960 to Richard and Roxelyn Pepper. He was a civil engineering graduate of Iowa State University, where he met his wife, Katy. Dave served as CEO of Pepper Construction Group and lived his life in service to others and was widely known for his kindness and generosity.

Dave's life centered around his family and friends. He enjoyed cooking, boating and travelling and frequently said that being part of his family was the best leadership lesson of his life. He believed that values shape lives, particularly through unexpected turns, and Dave instilled honesty, gratitude and openness into the culture of Pepper Construction, which he led from 2003. 

Dave was known as a champion of education and held multiple leadership roles including president of the Associated General Contractors (AGC) Education and Research Foundation, a nonprofit charitable organization dedicated to improving the science of construction. Dave was also involved in workforce readiness and school mentoring programs. Most recently, Dave served on the Providence St. Mel School Board of Trustees; the Dominican University Board of Trustees; Junior Achievement of Chicago's Board of Directors and Executive Committee; and served as a  Management Trustee to the Chicago Regional Council of Carpenters and supported their educational programs over several decades. 

Dave also actively served the community as a member at St. Michael’s Episcopal church and was a member of the Economic Club of Chicago; The Chicago Club; the Max McGraw Wildlife Foundation and The Commercial Club of Chicago. Dave leaves behind his loving wife Katy and their three children, Ali, Lauren and Colin; as well as his parents, Richard and Roxelyn Pepper; brothers, Dick, Stan, Scot; and sisters, Lisa and Lynda; and numerous nieces, nephews and cousins.

A memorial visitation will be held Friday, January 3, from 4:00 – 8:00 p.m. at St. Michael’s Episcopal Church located at 647 Dundee Avenue in Barrington. The memorial service will be at 10:00 a.m. on Saturday, January 4 at the church.  Additional parking will be available across the street at St. Matthew Lutheran Church located at 720 Dundee Avenue.  

In lieu of flowers, donations in Dave's memory can be made to Bishop Anderson House at https://www.bishopandersonhouse.org/donate/  and St. Michael's Youth Program at 847-381-2323 or info@stmichaelsbarrington.org.  For more information, or to sign the guestbook please visit https://www.davenportfamily.com/notices/JamesDave-Pepper.

Related Stories

| Feb 15, 2011

New Urbanist Andrés Duany: We need a LEED Brown rating

Andrés Duany advocates a "LEED Brown" rating that would give contractors credit for using traditional but low cost measures that are not easy to quantify or certify. He described these steps as "the original green," and "what we did when we didn't have money." Ostensibly, LEED Brown would be in addition to the current Silver, Gold and Platinum ratings.

| Feb 14, 2011

Sustainable Roofing: A Whole-Building Approach

According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Feb 11, 2011

Four Products That Stand Up to Hurricanes

What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Feb 11, 2011

Former Richardson Romanesque hotel now houses books, not beds

The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021