flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

People+Firms

People+Firms


August 11, 2010
This article first appeared in the 200906 issue of BD+C.

The world's largest retail design firm, Callison, just got larger with the acquisition of Dallas-based retail architect RYA Design Consultancy. RYA specializes in U.S. and international department store and specialty retail brands, including Printemps, Palacio de Hierro, and Shinsegae. The new Callison RYA Studio will merge staff and clients into Callison's existing retail practice at its Dallas and New York offices.Shawmut Design and Construction, Boston, has promoted 16-year Shawmut veteran Brian Stys to the newly created position of VP of marketing and business development.Riverside, Calif.-based general contractor J.D. Diffenbaugh has named Jeff Dale president.Clayco, St. Louis, has appointed Scott Higgins director of government construction and design.The Orlando office of VOA Associates has named Daryl LeBlanc, AIA, and Thomas Matzke, CSI, LEED, AP, associate principals.Geoffrey Stryker, PE, has joined STV Inc. as a senior structural engineer and project manager in the firm's Transportation and Infrastructure Division. Stryker will be based out of STV's Harrisburg, Pa., office.Nashville, Tenn.-based Gresham, Smith and Partners has named eight staff members owners: Tim Arendt, Ken Baker, Roddy L. Boggus, Jody Braswell, Lori Lange, David Stewart, Jody Vance, and Mark Warriner.Chicago-based Environmental Systems Design has named David P. Callan, PE, LEED AP, senior VP chief technical director. Callan, a BD+C 40 Under 40 winner, specializes in the design of high-performance and sustainable building projects.

Related Stories

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021