flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Peer review process under way for the WELL Building Standard

Peer review process under way for the WELL Building Standard

The standard is the first protocol of its kind that focuses on improving the health and wellbeing of building occupants.


By BD+C Staff | May 28, 2014
CBRE's global headquarters in Los Angeles is the world's first WELL-certified co
CBRE's global headquarters in Los Angeles is the world's first WELL-certified commercial office. Photo: courtesy CBRE

The International Well Building Institute (IWBI) kicked off a peer review process for the WELL Building Standard. The process will include three phases—a scientific, practitioner and medical review. Late this year, the results will be reflected in the release of v1.0 of the standard.

The standard is the first protocol of its kind that focuses on improving human wellness within the built environment by identifying specific conditions that, when holistically integrated into building interiors, enhance the health and wellbeing of the occupants.

The first phase—a thorough review of the underlying science behind the standard — will focus on performance benchmarks such as air and water contaminants, the relationship between indoor lighting and circadian rhythm, and mold and other biological contaminants. Later this year, two additional steps in the process towards v1.0 will include engaging with leading building and medical practitioners for further review and refinement of the standard.

The peer review will be transparent, and will include a published roster of contributing physicians, researchers, and practitioners. In addition, aggregated comments from the peer review will be published online along with an explanation of how the WELL Building Standard evolved as a result of this input.

(http://www.multihousingnews.com/news/iwbi-launches-peer-review-process-for-the-well-building-standard/1004102897.html)

Related Stories

Codes and Standards | Aug 20, 2020

Wariness of elevators may stymie office reopening

Workers could balk at returning to high-rises.

Codes and Standards | Aug 18, 2020

Florida becomes the third state to adopt concrete repair code

Sets minimum requirements for design, construction, repair of concrete structural elements in buildings.

Codes and Standards | Aug 17, 2020

ASCE seeks comments on seismic standard

Pertains to design criteria for nuclear facilities.

Codes and Standards | Aug 13, 2020

COVID-19 reboot guide offers strategies for reopening K-12 schools

Looks at space considerations for reopening at different scales.

Codes and Standards | Aug 12, 2020

Document provides guidance for mass timber construction

Overview of Intl. Building Code requirements included.

Codes and Standards | Aug 11, 2020

Inefficient air conditioning is a key contributor to global warming

More efficient equipment and buildings could make a big difference.

Codes and Standards | Aug 10, 2020

Concrete Institute and Post-Tensioning Institutes expand partnership

Will collaborate on new structural post-tensioned concrete code requirements.

Codes and Standards | Aug 6, 2020

SpeedCore demonstrates excellent fire resistance without additional fire-protective coatings

New York City approves metal-concrete product for all five boroughs.

Codes and Standards | Aug 5, 2020

Designing, redeveloping communities for zero energy needed to address climate change

District heating and cooling systems boost efficiency.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021