flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Pearce Brinkley Cease + Lee joins Clark Nexsen

Pearce Brinkley Cease + Lee joins Clark Nexsen

The merger will provide key benefits for both firms and their clients.


By Clark Nexsen | March 29, 2013

As a result of this merger, Clark Nexsen will be comprised of a 550-plus, multi-discipline staff including architects, engineers (civil, structural, mechanical, electrical, and fire protection), interior designers, landscape architects, planners, and other support personnel.

The combined staff represents decades of expertise in educational, Department of Defense, government, corporate, cultural, industrial, recreational, commercial, healthcare, K-12, and environmentally sustainable design and engineering.

For Clark Nexsen, the merger allows the 93-year-old, internationally renowned A/E firm to confirm and enhance its pursuit of design excellence through PBC+L’s reputation for award-winning architectural projects. PBC+L has received 35 American Institute of Architects (AIA) design awards in just the last 10 years.

For PBC+L, a 68-year-old company that was ranked 15th in Architect magazine’s “Top 50 Firms in the Nation” in 2012, joining Clark Nexsen dramatically broadens the firm’s geographic reach, offers the opportunity to secure nationally significant projects, and provides top-tier in-house engineering services to current and future clients.

“Clients and staff from both firms will experience positive change as a result of the merger, “ said Christopher Stone, PE, F.NSPE, F.ASCE, President of Clark Nexsen. “In addition to a far deeper level of design services, our clients and our staff will benefit from our combined engineering, operations, resources, and infrastructure.”

Jeffrey Lee, FAIA, a principal with Pearce Brinkley Cease + Lee, added: “At the center of this decision is our common desire to underscore our commitment to design excellence and to offer clients an architecture and engineering firm recognized for exceptional, high performance design and professional services.”

Related Stories

Designers / Specifiers / Landscape Architects | Oct 6, 2022

DAHLIN announces acquisition of Design Line Interiors

DAHLIN Architecture | Planning | Interiors announced today that it is expanding its interiors capabilities with the acquisition of Del Mar, California-based Design Line Interiors.

Contractors | Oct 6, 2022

Modular construction gets boost from impacts of the pandemic

The impact of the Covid pandemic on the construction industry appears to be fueling demand for modular construction methods, especially in the western U.S. and Canada.

Laboratories | Oct 5, 2022

Bigger is better for a maturing life sciences sector

CRB's latest report predicts more diversification and vertical integration in research and production.

Multifamily Housing | Oct 5, 2022

Co-living spaces, wellness-minded designs among innovations in multifamily housing

The booming multifamily sector shows no signs of a significant slowdown heading into 2023. Here is a round up of Giants 400 firms that are driving innovation in this sector.

Contractors | Oct 5, 2022

Materials shortages, cost spikes throwing Design-Bid-Build process out of whack

The traditional Design-Bid-Build delivery process is under considerable stress this year as materials shortages and cost spikes are upending usual practices, according to a new report from JLL.

Green | Oct 5, 2022

In California, a public power provider’s new headquarters serves as a test case for an innovative microgrid and for reducing greenhouse gas emissions

Sonoma Clean Power (SCP), the public power provider for California’s Sonoma and Mendocino Counties, recently unveiled its new all-electric headquarters.

Contractors | Oct 4, 2022

Which comes first, the building or the cost estimate?

At the start of a project, don’t forget to establish financial parameters when you’re discussing the design and program. By establishing the costs up front, you can avoid the pitfalls that might derail your project and guarantee its lasting success.

Fire and Life Safety | Oct 4, 2022

Fire safety considerations for cantilevered buildings

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

| Oct 4, 2022

Rental property owners want access to utility usage data for whole properties

As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.

| Oct 4, 2022

In dire need of affordable housing, Aspen, Colo. will get a development that provides 277 affordable homes

A few miles from downtown Aspen, Colo., a development will provide 277 new affordable homes for an area experiencing a dire affordable housing crisis.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021