As a result of this merger, Clark Nexsen will be comprised of a 550-plus, multi-discipline staff including architects, engineers (civil, structural, mechanical, electrical, and fire protection), interior designers, landscape architects, planners, and other support personnel.
The combined staff represents decades of expertise in educational, Department of Defense, government, corporate, cultural, industrial, recreational, commercial, healthcare, K-12, and environmentally sustainable design and engineering.
For Clark Nexsen, the merger allows the 93-year-old, internationally renowned A/E firm to confirm and enhance its pursuit of design excellence through PBC+L’s reputation for award-winning architectural projects. PBC+L has received 35 American Institute of Architects (AIA) design awards in just the last 10 years.
For PBC+L, a 68-year-old company that was ranked 15th in Architect magazine’s “Top 50 Firms in the Nation” in 2012, joining Clark Nexsen dramatically broadens the firm’s geographic reach, offers the opportunity to secure nationally significant projects, and provides top-tier in-house engineering services to current and future clients.
“Clients and staff from both firms will experience positive change as a result of the merger, “ said Christopher Stone, PE, F.NSPE, F.ASCE, President of Clark Nexsen. “In addition to a far deeper level of design services, our clients and our staff will benefit from our combined engineering, operations, resources, and infrastructure.”
Jeffrey Lee, FAIA, a principal with Pearce Brinkley Cease + Lee, added: “At the center of this decision is our common desire to underscore our commitment to design excellence and to offer clients an architecture and engineering firm recognized for exceptional, high performance design and professional services.”
Related Stories
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.
| Nov 28, 2011
Armstrong acquires Simplex Ceilings
Simplex will become part of the Armstrong Building Products division.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas
Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Nov 22, 2011
New Green Matters Conference examines emerging issues in concrete and sustainability
High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.