As a result of this merger, Clark Nexsen will be comprised of a 550-plus, multi-discipline staff including architects, engineers (civil, structural, mechanical, electrical, and fire protection), interior designers, landscape architects, planners, and other support personnel.
The combined staff represents decades of expertise in educational, Department of Defense, government, corporate, cultural, industrial, recreational, commercial, healthcare, K-12, and environmentally sustainable design and engineering.
For Clark Nexsen, the merger allows the 93-year-old, internationally renowned A/E firm to confirm and enhance its pursuit of design excellence through PBC+L’s reputation for award-winning architectural projects. PBC+L has received 35 American Institute of Architects (AIA) design awards in just the last 10 years.
For PBC+L, a 68-year-old company that was ranked 15th in Architect magazine’s “Top 50 Firms in the Nation” in 2012, joining Clark Nexsen dramatically broadens the firm’s geographic reach, offers the opportunity to secure nationally significant projects, and provides top-tier in-house engineering services to current and future clients.
“Clients and staff from both firms will experience positive change as a result of the merger, “ said Christopher Stone, PE, F.NSPE, F.ASCE, President of Clark Nexsen. “In addition to a far deeper level of design services, our clients and our staff will benefit from our combined engineering, operations, resources, and infrastructure.”
Jeffrey Lee, FAIA, a principal with Pearce Brinkley Cease + Lee, added: “At the center of this decision is our common desire to underscore our commitment to design excellence and to offer clients an architecture and engineering firm recognized for exceptional, high performance design and professional services.”
Related Stories
| Dec 4, 2012
Greenhorne & O’Mara signs letter of intent to join Stantec
Acquisitions of C3TS and Architecture 2000 also completed.
| Dec 4, 2012
Sto Corp. announces new distributor in the Carolinas
Company will now have coverage in several parts of North Carolina.
| Dec 4, 2012
Wirtz Beverage Illinois’ corporate headquarters completed
WBI Center, a new state-of-the-art facility, is designed by Ware Malcomb.
| Dec 4, 2012
Wagner joins Ghafari as Manager of Structural Engineering
Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million.
| Dec 4, 2012
City of Gainesville to break ground on $33 million bus fleet maintenance and ops facility
The 140,000-sf facility will include dispatch, administrative and maintenance facilities.
| Nov 28, 2012
Project team to showcase design for first mixed-use retail center of its kind in Mexico City
Project reaching construction milestone, offering national model for urban development in Mexico.
| Nov 28, 2012
Cummins announces ratings classification for data center power systems
The Data Center Continuous ratings span the range of Cummins Power Generation’s high horsepower diesel generator sets, from 1 MW up to 2.5 MW, and will apply to both 50 Hz and 60 Hz configurations.
| Nov 28, 2012
Francis Cauffman appoints Stainbrook Director of Higher Education
Stainbrook has 16 years of experience as a strategic planner and urban designer working on complex projects on- and off-campus.
| Nov 27, 2012
SFIA releases technical guide for cold-formed steel framing products
The 114-page book covers both structural and non-structural applications, including section properties of SFIA member product profiles, and complete load and span tables for most applications.
| Nov 21, 2012
Architecture Billings Index positive for third straight month
All regions reporting positive business conditions