flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Pearce Brinkley Cease + Lee joins Clark Nexsen

Pearce Brinkley Cease + Lee joins Clark Nexsen

The merger will provide key benefits for both firms and their clients.


By Clark Nexsen | March 29, 2013

As a result of this merger, Clark Nexsen will be comprised of a 550-plus, multi-discipline staff including architects, engineers (civil, structural, mechanical, electrical, and fire protection), interior designers, landscape architects, planners, and other support personnel.

The combined staff represents decades of expertise in educational, Department of Defense, government, corporate, cultural, industrial, recreational, commercial, healthcare, K-12, and environmentally sustainable design and engineering.

For Clark Nexsen, the merger allows the 93-year-old, internationally renowned A/E firm to confirm and enhance its pursuit of design excellence through PBC+L’s reputation for award-winning architectural projects. PBC+L has received 35 American Institute of Architects (AIA) design awards in just the last 10 years.

For PBC+L, a 68-year-old company that was ranked 15th in Architect magazine’s “Top 50 Firms in the Nation” in 2012, joining Clark Nexsen dramatically broadens the firm’s geographic reach, offers the opportunity to secure nationally significant projects, and provides top-tier in-house engineering services to current and future clients.

“Clients and staff from both firms will experience positive change as a result of the merger, “ said Christopher Stone, PE, F.NSPE, F.ASCE, President of Clark Nexsen. “In addition to a far deeper level of design services, our clients and our staff will benefit from our combined engineering, operations, resources, and infrastructure.”

Jeffrey Lee, FAIA, a principal with Pearce Brinkley Cease + Lee, added: “At the center of this decision is our common desire to underscore our commitment to design excellence and to offer clients an architecture and engineering firm recognized for exceptional, high performance design and professional services.”

Related Stories

Architects | Mar 18, 2015

Boston selects finalists in resilient design competition

The competition asks for creative approaches for planning for a not-so-distant future Boston where higher sea levels and more frequent flooding will be real and critical issues to contend with.

Cultural Facilities | Mar 17, 2015

The High Line’s co-designer wins contract for The Underline in Miami

James Corner Field Operations will design the master plan for this 10-mile restoration project. 

Sponsored | | Mar 17, 2015

Are face-to-face meetings still important?

One CEO looks pass convenience and advocates for old school, in-person meetings.

High-rise Construction | Mar 16, 2015

NBBJ creates 'shadowless' skyscraper concept for proposed UK development

A team of architects from the London branch of NBBJ used computer algorithms to generate a dual-tower design that maximizes sunlight reflections to eliminate the buildings' shadows. 

Healthcare Facilities | Mar 16, 2015

Healthcare planning in a post-ACA world: 3 strategies for success

Healthcare providers are seeking direction on how to plan for a value-based world while still very much operating in a volume-based market. CBRE Healthcare's Curtis Skolnick offers helpful strategies. 

Resort Design | Mar 16, 2015

Giancarlo Zema Design Group unveils plans for semi-submerged resort in Qatar

The resort will have four semi-submerged hotels that look similar to super-yachts, each including 75 luxury suites with private terraces.

Mixed-Use | Mar 13, 2015

Dubai announces mega waterfront development Aladdin City

Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.

Contractors | Mar 13, 2015

Construction materials prices rise for first time in six months

The largest monthly gain in petroleum prices in over three years caused construction materials prices to expand 0.4% in February, ending a six-month streak when prices failed to rise, according to the Bureau of Labor Statistics.

High-rise Construction | Mar 12, 2015

Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul

If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia.

High-rise Construction | Mar 12, 2015

Foster and Partners designs 'The One' in Toronto

Developer Sam Mizrahi worked with Foster and Partners and Core Architects to design Toronto's tallest skyscraper aside from the CN Tower, The One, which will house a luxury shopping mall and condos.

boombox1
boombox2
native1

More In Category

Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021