PC Construction recently completed construction of Champlain’s Juniper Hall. The $7.7 million, 29,200 square foot, 95-bed residential hall is located in the center of the hillside campus. Exterior features include brick, stone and flat-seam metal panels, a slate-shingled roof and stone walls with granite accents.
Nestled in the four-story residence are features including a stone entrance and fireplace, wood floors, student lounges and a large gathering space, a ski-tuning room, laundry facilities, a full kitchen, television viewing area, and large windows featuring stunning views of Lake Champlain.
At Champlain College, environmental stewardship and sustainability are also critically important.
Recognized by the Princeton Review as one of 322 Green Colleges, Champlain College’s Juniper Hall is on track for LEED Gold certification from the U.S. Green Building Council. In a Princeton Review survey of more than 7,400 college applicants, 68 percent said that a college’s commitment to the environment would have an impact on their decision to apply to or attend the school. Specific criteria included having a healthy and sustainable quality-of-life on campus, how well the school prepares students for employment and citizenship in a world defined by environmental challenges, and the school’s overall commitment to sustainability issues.
Champlain College and PC Construction are scheduled to break ground on two other residential halls in the spring of 2013. +
Related Stories
| Oct 14, 2011
Midwest construction firms merge as Black and Dew
Merger is aimed at increasing market sector capabilities and building on communication and core contracting competencies.
| Oct 14, 2011
AIA Continuing Education: optimizing moisture protection and air barrier systems
Earn 1.0 AIA/CES learning units by studying this article and passing the online exam.
| Oct 12, 2011
BIM Clarification and Codification in a Louisiana Sports Museum
The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.
| Oct 12, 2011
Vertical Transportation Systems Reach New Heights
Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently.
| Oct 12, 2011
Building a Double Wall
An aged federal building gets wrapped in a new double wall glass skin.
Office Buildings | Oct 12, 2011
8 Must-know Trends in Office Fitouts
Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 12, 2011
Bulley & Andrews celebrates 120 years of construction
The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction.
| Oct 12, 2011
Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health
Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will
| Oct 11, 2011
AIA introduces five new documents for use on sustainable projects
These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.