PC Construction recently completed construction of Champlain’s Juniper Hall. The $7.7 million, 29,200 square foot, 95-bed residential hall is located in the center of the hillside campus. Exterior features include brick, stone and flat-seam metal panels, a slate-shingled roof and stone walls with granite accents.
Nestled in the four-story residence are features including a stone entrance and fireplace, wood floors, student lounges and a large gathering space, a ski-tuning room, laundry facilities, a full kitchen, television viewing area, and large windows featuring stunning views of Lake Champlain.
At Champlain College, environmental stewardship and sustainability are also critically important.
Recognized by the Princeton Review as one of 322 Green Colleges, Champlain College’s Juniper Hall is on track for LEED Gold certification from the U.S. Green Building Council. In a Princeton Review survey of more than 7,400 college applicants, 68 percent said that a college’s commitment to the environment would have an impact on their decision to apply to or attend the school. Specific criteria included having a healthy and sustainable quality-of-life on campus, how well the school prepares students for employment and citizenship in a world defined by environmental challenges, and the school’s overall commitment to sustainability issues.
Champlain College and PC Construction are scheduled to break ground on two other residential halls in the spring of 2013. +
Related Stories
| Apr 24, 2012
Roofing Supply Group acquired by Clayton, Dubilier & Rice
RSG provides a complete offering of residential and commercial roofing materials and related supplies.
| Apr 24, 2012
McLennan named Ashoka Fellow
McLennan was recognized for his work on the Living Building Challenge.
| Apr 24, 2012
AECOM design and engineering team realizes NASA vision for Sustainability Base
LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.
| Apr 23, 2012
Vegas’ CityCenter called financial ‘black hole’
Two and a half years ago, stockholders filed six lawsuits after the stock price fell from $99.75 on Oct. 9, 2007, to $1.89 on March 5, 2009. Bondholders sued over similar steep losses.
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
| Apr 23, 2012
AAMA releases updated specification for anodized aluminum
AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.
| Apr 23, 2012
Thornton Tomasetti project wins AISC Merit Award
Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.
| Apr 23, 2012
Construction underway on City Winery Chicago
The Building Team is maintaining the old brick and timber construction, while adding 5,000-sf of new construction in the form of a two-story addition within the site’s existing courtyard.
| Apr 20, 2012
McCarthy completes Santa Barbara Cottage Hospital Replacement Facility
The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.