The design for the new 200-meter, 54-story Jardins de l’Arche Tower has been unveiled by Ateliers 2/3/4/. The tower will rise in Nanterre La defense, Paris and comprise 65,000 sm across three sliding, superimposed volumes.
The first volume will provide 15,000 sm of office space while the second and third volumes will contain 700 hotel rooms. However, these rooms will be split between three different hotel complexes.
The second volume will comprise 300 rooms operating under the Holiday Inn brand. The third volume will have 400 rooms total, split evenly between the Staybridge Suits and Crowne Plaza brands. The Staybridge Suites hotel will have the bottom 200 floors in the volume while the Crowne Plaza occupies the top 200. Each hotel has its own double height lobby at each volume interface that is extended by a garden terrace overlooking the city.
A belvedere sits atop the three volumes providing views of the surrounding city and is open to the general public or can be booked for private events. Other amenities include a conference center, swimming pool, panoramic restaurant, fabrication lab, and fitness center.
The tower, scheduled for completion in 2022, is hoping to achieve LEED Gold certification and BREEAM Excellent.
Video: ©Agence Martingale
Rendering: ©Ateliers 2/3/4/
Rendering: ©Ateliers 2/3/4/
Rendering: ©Ateliers 2/3/4/
Rendering: ©Ateliers 2/3/4/
Rendering: ©Ateliers 2/3/4/
Related Stories
| May 1, 2012
Time-lapse video: World Trade Center, New York
One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.
| Apr 27, 2012
China Mobile selects Leo A Daly to design three buildings at its new HQ
LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.
| Apr 25, 2012
McCarthy introduces high school students to a career in construction
High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.
| Apr 25, 2012
J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University
The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.
| Apr 24, 2012
ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
| Apr 10, 2012
Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo
Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.
| Apr 6, 2012
Flat tower green building concept the un-skycraper
A team of French designers unveil the “Flat Tower” design, a second place winner in the 2011 eVolo skyscraper competition.
| Apr 4, 2012
Bald joins the Harmon glazing team
Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.
| Apr 2, 2012
Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper
The operation of the elevator is scheduled to begin in 2014.