flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Parex introduces cooler and stronger EIFS basecoats and adhesives

Parex introduces cooler and stronger EIFS basecoats and adhesives

New 121 Cool Base and 121 Dry HI Now Available


By Parex | February 28, 2013
Parex USA, Inc., the parent company of leading building material brands; Parex,
Parex USA, Inc., the parent company of leading building material brands; Parex, Teifs, LaHabra, El Rey, and Merkrete, unveils tw

Parex USA, Inc., the parent company of leading building material brands; Parex, Teifs, LaHabra, El Rey, and Merkrete, unveils two new Parex EIFS basecoats & adhesives – 121 Cool Base and 121 Dry HI (High Impact).  Designed with the contractor in mind, the two new products boast extreme coolness and unsurpassed strength.

121 Cool Base is a premium, white EIFS basecoat and adhesive that is incomparable in the industry.  It produces a 30 percent cooler basecoat temperature than typical basecoats & adhesives, which results in less suction and hydration when a final finish is applied.  This technology allows for improved finish coverage as well as a faster and easier finish application. 

“With the potential of improved finish coverage and ease of finish application, Parex’s new 121 Cool Base is set to make a big impact in the market,” said Heidi Larsen, Parex USA Product Manager.  “When we presented a sneak peak of this product to contractors during our annual meeting, it was received with enthusiasm and overwhelming interest. Everyone was amazed at the drastic temperature differences between 121 Cool Base and standard EIFS basecoats & adhesives.”

Parex also introduces 121 Dry HI – a high performance EIFS basecoat and adhesive that is fortified with a unique blend of raw materials for increased impact and puncture resistance.  It yields up to 30 percent better impact resistance (compared to standard EIFS basecoats & adhesives).   121 Dry HI is formulated for enhanced workability and provides easier application.  This product is ideal for ground floors and other areas where greater impact resistance is required.

“In addition to providing 30 percent more impact resistance, 121 Dry HI also helps achieve higher ASTM/EIMA impact classifications,” said Larsen.  “Typically, to achieve a “High” impact classification, a High Impact mesh (15 oz.) plus an additional layer of Standard Mesh (4.5 oz.) is required.  Now, you can achieve a “High” impact classification utilizing a single layer of Intermediate Mesh (12 oz.) embedded in 121 Dry HI.”   This system greatly reduces material and labor costs. 

121 Cool Base and 121 Dry HI are one-component, polymer-modified, cement based dry products that are used as an adhesive to adhere EPS boards to existing substrates, a basecoat to embed reinforcing mesh and a leveler in Parex EIF Systems.  Both 121 Cool Base and 121 Dry HI are shipped in 50 pound bags.  Coverage, mixing instructions and limitations can be found in the Product Data Sheet at www.parex.com.  

Related Stories

| Aug 11, 2010

Embassy's dual façades add security and beauty

The British government's new 46,285-sf embassy building in Warsaw, Poland's diplomatic quarter houses the ambassador's offices, the consulate, and visa services on three floors. The $20 million Modernist design by London-based Tony Fretton Architects features a double façade—an inner concrete super structure and an outer curtain wall.

| Aug 11, 2010

Precast All the Way

For years, precast concrete has been viewed as a mass-produced product with no personality or visual appeal—the vanilla of building materials. Thanks to recent technological innovations in precast molds and thin veneers, however, that image is changing. As precast—concrete building components that are poured and molded offsite—continues to develop a vibrant personality all it...

| Aug 11, 2010

Seven tips for specifying and designing with insulated metal wall panels

Insulated metal panels, or IMPs, have been a popular exterior wall cladding choice for more than 30 years. These sandwich panels are composed of liquid insulating foam, such as polyurethane, injected between two aluminum or steel metal face panels to form a solid, monolithic unit. The result is a lightweight, highly insulated (R-14 to R-30, depending on the thickness of the panel) exterior clad...

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Enclosure strategies for better buildings

Sustainability and energy efficiency depend not only on the overall design but also on the building's enclosure system. Whether it's via better air-infiltration control, thermal insulation, and moisture control, or more advanced strategies such as active façades with automated shading and venting or novel enclosure types such as double walls, Building Teams are delivering more efficient, better performing, and healthier building enclosures.

| Aug 11, 2010

Glass Wall Systems Open Up Closed Spaces

Sectioning off large open spaces without making everything feel closed off was the challenge faced by two very different projects—one an upscale food market in Napa Valley, the other a corporate office in Southern California. Movable glass wall systems proved to be the solution in both projects.

boombox1
boombox2
native1

More In Category



Products and Materials

Top products from AIA 2024

This month, Building Design+Construction editors are bringing you the top products displayed at the 2024 AIA Conference on Architecture & Design. Nearly 550 building product manufacturers showcased their products—here are 17 that caught our eye.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021