During the opening keynote address at the International Consumer Electronics Show (CES) in Las Vegas, Nevada, Panasonic® Corporation announced the development of a new "4K Tablet" with a 20-inch 4K IPS Alpha LCD and a high precision pen. It is expected to enhance the way Architects, Engineers and Construction (AEC) professionals view and interact with digital drawings. Targeted to become available later this year, the tablet's 20-inch IPS Alpha LCD panel contains more than four times the resolution of Full High Definition. It leverages the touch capabilities of Windows 8 and includes a high precision digital pen for making notes on the panel's screen. Lightweight and less than an half inch thick, the tablet is slim, portable and represents the future of design review, bid, estimation, RFI response, and plan room access to drawing sets.
To help introduce this new technology to the AEC industry and demonstrate its endless possibilities, Panasonic is collaborating with Bluebeam® Software, a leading developer of PDF-based collaboration solutions for the design and construction industry, for R&D, product testing, and promotion.
"The upcoming 4K Panasonic tablet emulates the way design and construction professionals interact with printed drawings while giving users an incredibly high resolution view, making it simple to migrate from paper-based to digital workflows," said Bob Dobbins, Vice President, Corporate Planning & Strategic Initiatives at Panasonic Corporation of North America. "The potential of this technology is magnified when combined with the power of Bluebeam's PDF-based markup and collaboration solutions for the design and construction industry."
"When we first saw the prototype for the 4K tablet, we were blown away by the opportunities this device will offer project teams in the office and at the jobsite," said Richard Lee, CEO and President at Bluebeam Software. "We are excited to work with Panasonic and lend our knowledge and expertise of the AEC industry to bring this must-have technology to AEC professionals everywhere."
Bluebeam Software's flagship product, Revu®, is an award-winning PDF creation, markup and collaboration solution used by the world's top architecture, engineering and construction firms to digitally share and review project information. Revu enables users to electronically redline 2D and 3D PDFs with industry-standard markups and measurements, track all comments in an integrated Markups list, compare drawing revisions, store project files in the cloud and collaborate with others in real time. +
Related Stories
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.