During the opening keynote address at the International Consumer Electronics Show (CES) in Las Vegas, Nevada, Panasonic® Corporation announced the development of a new "4K Tablet" with a 20-inch 4K IPS Alpha LCD and a high precision pen. It is expected to enhance the way Architects, Engineers and Construction (AEC) professionals view and interact with digital drawings. Targeted to become available later this year, the tablet's 20-inch IPS Alpha LCD panel contains more than four times the resolution of Full High Definition. It leverages the touch capabilities of Windows 8 and includes a high precision digital pen for making notes on the panel's screen. Lightweight and less than an half inch thick, the tablet is slim, portable and represents the future of design review, bid, estimation, RFI response, and plan room access to drawing sets.
To help introduce this new technology to the AEC industry and demonstrate its endless possibilities, Panasonic is collaborating with Bluebeam® Software, a leading developer of PDF-based collaboration solutions for the design and construction industry, for R&D, product testing, and promotion.
"The upcoming 4K Panasonic tablet emulates the way design and construction professionals interact with printed drawings while giving users an incredibly high resolution view, making it simple to migrate from paper-based to digital workflows," said Bob Dobbins, Vice President, Corporate Planning & Strategic Initiatives at Panasonic Corporation of North America. "The potential of this technology is magnified when combined with the power of Bluebeam's PDF-based markup and collaboration solutions for the design and construction industry."
"When we first saw the prototype for the 4K tablet, we were blown away by the opportunities this device will offer project teams in the office and at the jobsite," said Richard Lee, CEO and President at Bluebeam Software. "We are excited to work with Panasonic and lend our knowledge and expertise of the AEC industry to bring this must-have technology to AEC professionals everywhere."
Bluebeam Software's flagship product, Revu®, is an award-winning PDF creation, markup and collaboration solution used by the world's top architecture, engineering and construction firms to digitally share and review project information. Revu enables users to electronically redline 2D and 3D PDFs with industry-standard markups and measurements, track all comments in an integrated Markups list, compare drawing revisions, store project files in the cloud and collaborate with others in real time. +
Related Stories
| May 18, 2011
Addition provides new school for pre-K and special-needs kids outside Chicago
Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.
| May 18, 2011
Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside
The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.
| May 18, 2011
New center provides home to medical specialties
Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.
| May 18, 2011
Improvements add to Detroit convention center’s appeal
Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.
| May 18, 2011
One of Delaware’s largest high schools seeks LEED for Schools designation
The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.
| May 18, 2011
Carnegie Hall vaults into the 21st century with a $200 million renovation
Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.
| May 17, 2011
Redesigning, redefining the grocery shopping experience
The traditional 40,000- to 60,000-sf grocery store is disappearing and much of the change is happening in the city. Urban infill sites and mixed-use projects offer grocers a rare opportunity to repackage themselves into smaller, more efficient, and more convenient retail outlets. And the AEC community will have a hand in developing how these facilities will look and operate.
| May 17, 2011
Architecture billings index fell in April, hurt by tight financing for projects
The architecture billings index, a leading indicator of U.S. construction activity, fell in April, hurt by tight financing for projects. The architecture billings index fell 2.9 points last month to 47.6, a level that indicates declining demand for architecture services, according to the American Institute of Architects.