During the opening keynote address at the International Consumer Electronics Show (CES) in Las Vegas, Nevada, Panasonic® Corporation announced the development of a new "4K Tablet" with a 20-inch 4K IPS Alpha LCD and a high precision pen. It is expected to enhance the way Architects, Engineers and Construction (AEC) professionals view and interact with digital drawings. Targeted to become available later this year, the tablet's 20-inch IPS Alpha LCD panel contains more than four times the resolution of Full High Definition. It leverages the touch capabilities of Windows 8 and includes a high precision digital pen for making notes on the panel's screen. Lightweight and less than an half inch thick, the tablet is slim, portable and represents the future of design review, bid, estimation, RFI response, and plan room access to drawing sets.
To help introduce this new technology to the AEC industry and demonstrate its endless possibilities, Panasonic is collaborating with Bluebeam® Software, a leading developer of PDF-based collaboration solutions for the design and construction industry, for R&D, product testing, and promotion.
"The upcoming 4K Panasonic tablet emulates the way design and construction professionals interact with printed drawings while giving users an incredibly high resolution view, making it simple to migrate from paper-based to digital workflows," said Bob Dobbins, Vice President, Corporate Planning & Strategic Initiatives at Panasonic Corporation of North America. "The potential of this technology is magnified when combined with the power of Bluebeam's PDF-based markup and collaboration solutions for the design and construction industry."
"When we first saw the prototype for the 4K tablet, we were blown away by the opportunities this device will offer project teams in the office and at the jobsite," said Richard Lee, CEO and President at Bluebeam Software. "We are excited to work with Panasonic and lend our knowledge and expertise of the AEC industry to bring this must-have technology to AEC professionals everywhere."
Bluebeam Software's flagship product, Revu®, is an award-winning PDF creation, markup and collaboration solution used by the world's top architecture, engineering and construction firms to digitally share and review project information. Revu enables users to electronically redline 2D and 3D PDFs with industry-standard markups and measurements, track all comments in an integrated Markups list, compare drawing revisions, store project files in the cloud and collaborate with others in real time. +
Related Stories
| Sep 5, 2012
Pagano joins Thornton Tomasetti as Vice President in Newark office
Pagano is a Certified Energy Planner and Certified Energy Manager through the Association of Energy Engineers.
| Aug 30, 2012
John S Clark Co. completes teaching lab at UNC Wilmington
Three-story building provides offices, classrooms, and labs.
| Aug 29, 2012
BOND completes South Cove Community Health Center
$11 million, 21,000 square foot community health center opens in Quincy, Mass.
| Aug 29, 2012
Mamayek joins HDR as Design Principal in Boston
He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.
| Aug 28, 2012
McCarthy begins construction on transportation center at Bob Hope Airport
Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.
| Aug 28, 2012
Wisnewski Blair & Associates changes name to HGA Mid-Atlantic
New name reflects firm's growing design resources on East Coast.
| Aug 24, 2012
Meis heads to Woods Bagot Sport
Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.
| Aug 21, 2012
Under 40 Leadership Summit slated for October 3-5 in Chicago
Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.
| Aug 21, 2012
Hong Kong’s first LEED Platinum pre-certified building opens
Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.