During the opening keynote address at the International Consumer Electronics Show (CES) in Las Vegas, Nevada, Panasonic® Corporation announced the development of a new "4K Tablet" with a 20-inch 4K IPS Alpha LCD and a high precision pen. It is expected to enhance the way Architects, Engineers and Construction (AEC) professionals view and interact with digital drawings. Targeted to become available later this year, the tablet's 20-inch IPS Alpha LCD panel contains more than four times the resolution of Full High Definition. It leverages the touch capabilities of Windows 8 and includes a high precision digital pen for making notes on the panel's screen. Lightweight and less than an half inch thick, the tablet is slim, portable and represents the future of design review, bid, estimation, RFI response, and plan room access to drawing sets.
To help introduce this new technology to the AEC industry and demonstrate its endless possibilities, Panasonic is collaborating with Bluebeam® Software, a leading developer of PDF-based collaboration solutions for the design and construction industry, for R&D, product testing, and promotion.
"The upcoming 4K Panasonic tablet emulates the way design and construction professionals interact with printed drawings while giving users an incredibly high resolution view, making it simple to migrate from paper-based to digital workflows," said Bob Dobbins, Vice President, Corporate Planning & Strategic Initiatives at Panasonic Corporation of North America. "The potential of this technology is magnified when combined with the power of Bluebeam's PDF-based markup and collaboration solutions for the design and construction industry."
"When we first saw the prototype for the 4K tablet, we were blown away by the opportunities this device will offer project teams in the office and at the jobsite," said Richard Lee, CEO and President at Bluebeam Software. "We are excited to work with Panasonic and lend our knowledge and expertise of the AEC industry to bring this must-have technology to AEC professionals everywhere."
Bluebeam Software's flagship product, Revu®, is an award-winning PDF creation, markup and collaboration solution used by the world's top architecture, engineering and construction firms to digitally share and review project information. Revu enables users to electronically redline 2D and 3D PDFs with industry-standard markups and measurements, track all comments in an integrated Markups list, compare drawing revisions, store project files in the cloud and collaborate with others in real time. +
Related Stories
Museums | Mar 5, 2015
A giant, silver loop in Dubai will house the Museum of the Future
The Sheikh of Dubai hopes the $136 million museum will serve as an incubator for ideas and real designs—a global destination for inventors and entrepreneurs.
Sports and Recreational Facilities | Mar 5, 2015
New HOK designs for St. Louis NFL stadium unveiled
Missouri Governor Jay Nixon has assembled a task force to develop plans for an open-air NFL stadium on the North Riverfront of downtown St. Louis.
Codes and Standards | Mar 5, 2015
Charlotte, N.C., considers rule for gender-neutral public bathrooms
A few other cities, including Philadelphia, Austin, Texas, and Washington D.C., already have gender-neutral bathroom regulations.
Codes and Standards | Mar 5, 2015
FEMA cuts off funding to Indiana after Kokomo continues building stadium in flood zone
FEMA will withhold funding on $5.5 million worth of projects such as building tornado safe rooms in schools.
Reconstruction & Renovation | Mar 5, 2015
Chicago's 7 most endangered properties
Preservation Chicago released its annual list of historic buildings that are at risk of being demolished or falling into decay.
Office Buildings | Mar 5, 2015
Goettsch Partners unveils plans for dual office towers in Warsaw
The Mennica Legacy Tower development is divided into a 35-story tower located on the south east side of the site and a 10-story building on the west side.
Hotel Facilities | Mar 4, 2015
Hotel construction pipeline reaches six-year high
After a three-year bottoming formation, the pipeline for hotel construction has posted five consecutive quarters of double-digit year-over-year growth.
BIM and Information Technology | Mar 4, 2015
Why China's CCTV building needed a WiFi retrofit
It took a year-long retrofit to get WiFi transmission issues solved at China's iconic skyscraper.
High-rise Construction | Mar 4, 2015
Must see: Egypt planning 656-foot pyramid skyscraper in Cairo
Zayed Crystal Spark Tower will stand 200 meters tall and will be just a short distance from the pyramids of Giza.
Transit Facilities | Mar 4, 2015
5+design looks to mountains for Chinese transport hub design
The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.