flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Palos Community Hospital plans upgrades, expansion

Palos Community Hospital plans upgrades, expansion


September 13, 2010
This article first appeared in the September 2010 issue of BD+C.

A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation. The $422 million project was chosen from four master plans drafted by Chicago-based Navigant Consulting and Matthei & Colin Associates. Plans also include relocation of the central energy plant, new emergency and walk-in entrances, and construction of a four-level, 600-car parking structure. Construction began midyear.

Related Stories

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021