flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Owners, AEC firms primed for real collaboration

Building Team

Owners, AEC firms primed for real collaboration

Survey findings point to a growing demand for collaboration and partnership during these chaotic times.


By John Caulfield, Senior Editor | April 15, 2021

Courtesy Pixabay

Cost isn’t the only thing on building owners’ minds these days, but it certainly informs their choices of AEC partners, projects, and products. This is one of the many takeaways from BD+C’s inaugural Owners Survey Report, which collected input from 156 building owners and developers throughout December 2020 and January 2021 on a variety of topics: their top development challenges, what they look for in AEC firm partners, and their most promising innovations.  

The survey findings point to a growing demand for collaboration and partnership during these chaotic times—and mounting frustration over a lack of focus and discipline among their AEC firm partners around project costs. 

“Architects and designers need to work within a budget,” said Michael Vachio, LEED AP, Vice President of Development and Construction for JL Capital in Hawaii. “The value engineering phase of a project is becoming longer and larger.”

Time and again, in their comments, owners asserted that AEC firms don’t listen to their concerns, especially—but not exclusively—about taming a project’s cost. Owners also claimed they want closer collaboration with their teams, subs, and suppliers, some to the point of encouraging integrated project delivery methods that ultimately speed the construction process.

At the very least, AEC firms might reconsider how they pitch projects, with an eye toward appreciating the owner’s perspective. 

AEC firms also need to overcome some owners’ lingering skepticism about investing in strategies that are environmentally responsible but whose implementation costs “impact the rents tenants are willing to pay and [what] financial institutions are willing to lend in some markets,” said Cassie Paben, Director of Business Development for Tetrad Property Group.

 


Click To Download BD+C's 2021 Owners Survey Report

 

This exclusive BD+C survey of 156 building owners and developers explores the changing and most-pressing needs of this highly influential group. From project financing to client service to design, construction, and operations, this research breaks down emerging trends, innovations, and the biggest wants and needs among owners/developers. The survey covers:
• What owners/developers look for in an AEC firm
• Biggest development challenges
• Top health/wellness/environmental strategies on projects
• Single-biggest innovation implemented on projects
• Response to the COVID-19 pandemic.

Download the 16-page PDF report with the complete findings from BD+C's 2021 Owners Survey. Thanks!


 

That being said, AEC firms should also test those waters to see if owners are prepared to enter into contractual commitments necessary for establishing accountable and financial collaboration on both sides.

Owner–AEC relations that work usually boil down to trust. Our survey reveals that, perhaps more than ever, owners are turning to their AEC partners to help their companies and projects take advantage of the 

latest products and best practices in such areas as technology, building systems, energy efficiency, and sustainability.

Our survey’s respondents sounded eager to try out new ideas that deliver predictable ROIs. But as one owner conceded, the industry is moving faster than any one company can keep up with. AEC firms only increase their value when they provide practical solutions for projects that factor in an owner’s budgetary, marketing, and operational parameters, as well as end-user and occupant comfort.

Download the Owners Survey Report at: BDCnetwork.com/OwnerSurvey2021.

Related Stories

| Nov 2, 2010

A Look Back at the Navy’s First LEED Gold

Building Design+Construction takes a retrospective tour of a pace-setting LEED project.

| Nov 2, 2010

Wind Power, Windy City-style

Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021