flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Owners, AEC firms primed for real collaboration

Building Team

Owners, AEC firms primed for real collaboration

Survey findings point to a growing demand for collaboration and partnership during these chaotic times.


By John Caulfield, Senior Editor | April 15, 2021

Courtesy Pixabay

Cost isn’t the only thing on building owners’ minds these days, but it certainly informs their choices of AEC partners, projects, and products. This is one of the many takeaways from BD+C’s inaugural Owners Survey Report, which collected input from 156 building owners and developers throughout December 2020 and January 2021 on a variety of topics: their top development challenges, what they look for in AEC firm partners, and their most promising innovations.  

The survey findings point to a growing demand for collaboration and partnership during these chaotic times—and mounting frustration over a lack of focus and discipline among their AEC firm partners around project costs. 

“Architects and designers need to work within a budget,” said Michael Vachio, LEED AP, Vice President of Development and Construction for JL Capital in Hawaii. “The value engineering phase of a project is becoming longer and larger.”

Time and again, in their comments, owners asserted that AEC firms don’t listen to their concerns, especially—but not exclusively—about taming a project’s cost. Owners also claimed they want closer collaboration with their teams, subs, and suppliers, some to the point of encouraging integrated project delivery methods that ultimately speed the construction process.

At the very least, AEC firms might reconsider how they pitch projects, with an eye toward appreciating the owner’s perspective. 

AEC firms also need to overcome some owners’ lingering skepticism about investing in strategies that are environmentally responsible but whose implementation costs “impact the rents tenants are willing to pay and [what] financial institutions are willing to lend in some markets,” said Cassie Paben, Director of Business Development for Tetrad Property Group.

 


Click To Download BD+C's 2021 Owners Survey Report

 

This exclusive BD+C survey of 156 building owners and developers explores the changing and most-pressing needs of this highly influential group. From project financing to client service to design, construction, and operations, this research breaks down emerging trends, innovations, and the biggest wants and needs among owners/developers. The survey covers:
• What owners/developers look for in an AEC firm
• Biggest development challenges
• Top health/wellness/environmental strategies on projects
• Single-biggest innovation implemented on projects
• Response to the COVID-19 pandemic.

Download the 16-page PDF report with the complete findings from BD+C's 2021 Owners Survey. Thanks!


 

That being said, AEC firms should also test those waters to see if owners are prepared to enter into contractual commitments necessary for establishing accountable and financial collaboration on both sides.

Owner–AEC relations that work usually boil down to trust. Our survey reveals that, perhaps more than ever, owners are turning to their AEC partners to help their companies and projects take advantage of the 

latest products and best practices in such areas as technology, building systems, energy efficiency, and sustainability.

Our survey’s respondents sounded eager to try out new ideas that deliver predictable ROIs. But as one owner conceded, the industry is moving faster than any one company can keep up with. AEC firms only increase their value when they provide practical solutions for projects that factor in an owner’s budgetary, marketing, and operational parameters, as well as end-user and occupant comfort.

Download the Owners Survey Report at: BDCnetwork.com/OwnerSurvey2021.

Related Stories

| Aug 11, 2010

Expansion of chemistry facility no experiment

A September ground breaking at Wayne State University in Detroit puts the school’s A. Paul Schaap Chemistry Building and Lecture Hall on track for a December 2010 completion. The $37 million, 96,000-sf facility is the second phase of a two-phase project to expand and renovate the existing chemistry building.

| Aug 11, 2010

Design for Miami Art Museum triples gallery space

Herzog & de Meuron has completed design development for the Miami Art Museum’s new complex, which will anchor the city’s 29-acre Museum Park, overlooking Biscayne Bay. At 120,000 sf with 32,000 sf of gallery space, the three-story museum will be three times larger than the current facility.

| Aug 11, 2010

Courtyard connects new and remodeled schools

Good Fulton & Farrell Architects of Dallas designed a major expansion and renovation at the Dallas Academy in Texas. The 22,900-sf addition serves as the school’s new front door and includes a library, student assembly area, cafeteria, seven classrooms, and administrative offices. The school’s existing 14,560-sf building was renovated to accommodate a lower school component, and...

| Aug 11, 2010

Baltimore gets new youth detention center

PSA-Dewberry is designing Baltimore’s $80 million downtown youth detention center. The five-story, 200,000-sf center will house youths who have been criminally charged as adults, and is the first phase of Maryland’s seven-phase plan to completely reconstruct the city’s downtown correctional campus.

| Aug 11, 2010

Rehabilitation center helps patients transition

Construction is under way on the Polytrauma Transitional Rehabilitation Center on the VA Medical Center campus in Richmond, Va. The $8 million, 22,000-sf facility will provide physical therapy, housing, and education to veterans as part of their transition back into their communities. The center was designed by HDR, Alexandria, Va.

| Aug 11, 2010

Community college’s hillside learning center

The Earl E. and Dorothy J. Dellinger Learning Resource Center at Southwest Virginia Community College in Richlands, Va., is the centerpiece of this mountainside school. Designed by Arlington, Va.-based The Lukmire Partnership, the 50,000-sf, two-story building connects the upper and lower campuses, which are separated by a 70-foot vertical grade change.

| Aug 11, 2010

Spa resort in harmony with mountain setting

The Sparkling Hill Resort and Wellness Hotel in Vernon, B.C., looks as if it was chiseled out of bedrock and jutting from the mountainside. Designed by the Victoria, B.C., office of Cannon Design, the 240,000-sf resort has 152 guest rooms with floor-to-ceiling windows and spa-like bathrooms, as well as a signature 20,000-sf whole-body wellness spa with treatment rooms designed to feel like they...

| Aug 11, 2010

Triangular tower targets travelers

Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.

| Aug 11, 2010

Expanding retail complex is LEED pre-certified

The Promenade at Coconut Creek in Broward County, Fla., a live-work-play shopping and lifestyle center, is being expanded by 105,000 sf. When phase II of the 335,000-sf project is complete, the facility will house 75 retailers, restaurants, and related services, making it one of the largest mixed-use projects in northern Broward County.

| Aug 11, 2010

Thom Mayne unveils ‘floating cube’ design for the Perot Museum of Nature and Science

Calling it a “living educational tool featuring architecture inspired by nature and science,” Pritzker Prize Laureate Thom Mayne unveiled the schematic designs and building model for the Perot Museum of Nature & Science at Victory Park in Dallas. The $185 million, 180,000-sf structure is 170 feet tall—equivalent to approximately 14 stories—and is conceived as a large...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021