flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Overuse of air conditioning hurts office productivity

Codes and Standards

Overuse of air conditioning hurts office productivity

A study found temperatures in the low 70s reduce worker performance.


By Peter Fabris, Contributing Editor | September 1, 2016

Pixabay Public Domain

Setting the air conditioning too high in an office is not only irresponsible from an energy use standpoint, it also degrades employee productivity.

There is strong data to back that premise. The director of the Human Factors and Ergonomics Laboratory at Cornell University pointed to a study that found offices with temperatures in the low 70s reduced the output of employees and led to increased mistakes.

The study measured the number of keystrokes employees typed in an office. In a 78F environment, workers produced more than twice as many keystrokes as those in a 70-degree environment. Productivity rose along with temperature in a linear fashion into the high 70s. It began to drop when temperatures reached the mid-80s.

The cold is distracting, with people doing things like rubbing their hands together for warmth. This issue may be impacted by the increased popularity of lighter, more casual wear in the office. De facto cooling temperature standards of 68F to 72F were established in the 1960s when business suits were the dominant office attire.

Related Stories

Codes and Standards | Jan 22, 2020

Potential energy savings from smart meters is largely unrealized

Most utilities underuse the technology that can help customers save money.

Codes and Standards | Jan 21, 2020

Contractors pay practices reviewed in new database

Fastest and slowest paying GCs revealed.

Codes and Standards | Jan 17, 2020

Several states with ambitious climate goals will have to restrict natural gas as a fuel

Buildings would have to heat and cook with electricity.

Codes and Standards | Jan 16, 2020

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.

Codes and Standards | Jan 14, 2020

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.

Codes and Standards | Jan 13, 2020

Kansas City is first in nation to offer free public transportation

Aim is to increase mobility to spur more economic activity.

Codes and Standards | Jan 9, 2020

Dept. of Defense will require beefed up cybersecurity standards in January

All contractors will have to demonstrate secure practices.

Codes and Standards | Jan 8, 2020

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

ASHRAE 90.1 is the basis for new code that went into effect Oct. 1.

Codes and Standards | Jan 8, 2020

Energy efficiency initiatives have significantly cut energy consumption per square foot

Lighting and space heating fell by more than 600 trillion Btu from 2003 to 2012.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021