flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Over budget Homeland Security headquarters project may be canceled

Over budget Homeland Security headquarters project may be canceled

Congressional support lacking for additional funds


By Peter Fabris, Contributing Editor | June 5, 2014
Under the original plan, the complex was scheduled to be finished as early as th
Under the original plan, the complex was scheduled to be finished as early as this year for less than $3 billion. But only a Coa

A massive new headquarters for the Department of Homeland Security is more than $1.5 billion over budget, 11 years behind schedule, and may never be completed.

When it was first proposed, the development was said to be critical for national security and the revitalization of Southeast Washington. The project on the grounds of the former St. Elizabeth’s Hospital would centralize the department’s operations. More than 50 historic buildings would be renovated and new ones erected.

Under the original plan, the complex was scheduled to be finished as early as this year for less than $3 billion. But only a Coast Guard building has been completed, with the rest of the grounds remaining undeveloped. The budget has inflated to $4.5 billion, with completion pushed back to 2026.

Neither Congressional Republicans nor Democrats have given the project much support, and the Obama Administration hasn’t made the project a priority, the Washington Post reported.

A revised administration plan with anticipated completion in 2026 was given to Congress last year, requiring about $280 million a year. It got only $190 million in 2014.

(http://www.washingtonpost.com/politics/planned-homeland-security-headquarters-long-delayed-and-over-budget-now-in-doubt/2014/05/20/d0df2580-dc42-11e3-8009-71de85b9c527_story.html)

Related Stories

Codes and Standards | Jul 12, 2017

New International Building Code allows weather-resistive barriers above 40 feet

Danger of propagating flames now deemed negligible.

Codes and Standards | Jul 10, 2017

New mass plywood panel project moves ahead with federal grant

New material is substitute for concrete and steel in multi-story projects.

Codes and Standards | Jul 6, 2017

Trump ups ante on apprenticeships, gives private sector more room to design them

Initiative aimed at alleviating construction industry worker shortage.

Codes and Standards | Jul 6, 2017

Flawed modeling to blame for green buildings failure to live up to hype on energy efficiency

Explains energy performance gap from expected savings to actual savings.

Codes and Standards | Jul 5, 2017

Research study examines tall timber buildings worldwide

Industry group developing criteria for categorizing wide range of construction approaches to tall timber buildings.

Codes and Standards | Jun 30, 2017

AAMA releases new document on aluminum fenestration and energy efficiency

The free download addresses entrances, storefront framing, curtain walls, windows and skylight fenestration systems.

Codes and Standards | Jun 29, 2017

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Reports suggest an extra $6,300 for fire-resistant cladding could have prevented the tragedy.

Codes and Standards | Jun 28, 2017

Minimum Design Loads and Associated Criteria for Buildings and Other Structures, Standards ASCE/SEI 7-16, has been updated

The document is used for determining design loads including dead, live, soil, flood, tsunami, snow, rain, atmospheric ice, earthquake, wind, and fire.

Codes and Standards | Jun 27, 2017

Cold-formed steel framing engineering guide for building projects released

Better sound attenuation for subfloors and exterior continuous insulation are among the matters addressed.

Codes and Standards | Jun 26, 2017

L.A.’s new ordinance requires energy and water efficiency benchmarking

Structures 20,000 sf and larger must demonstrate steps to boost efficiency.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021