flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Outdated federal rainfall analysis impacting infrastructure projects, flood insurance

Codes and Standards

Outdated federal rainfall analysis impacting infrastructure projects, flood insurance

Intense rain events are making the concept of a “1-in-100-year flood event” obsolete.


By Peter Fabris, Contributing Editor | July 17, 2023
Image by Roman Grac from Pixabay
Image by Roman Grac from Pixabay

The way the federal government analyzes intense rain events isn’t keeping up with the reality of climate change, and that has serious implications for infrastructure projects and the availability of, and rising cost of, flood insurance.

Severe rainstorms, sometimes described as “atmospheric rivers” or “torrential thunderstorms,” are making the concept of a “1-in-100-year flood event” obsolete, according to a report from First Street Foundation, an organization focused on weather risk research.

These events are occurring more frequently due to the impact of climate change, but federal rainfall analysis, managed by the National Oceanic and Atmospheric Administration, isn’t keeping up with the new weather conditions, First Street says.

Half the people in the U.S. live in a county where a 1-in-100-year flood is at least twice as likely now as it had been in the past, coming once every 50 years instead of every 100 years. In some areas, a so-called “1-in-100-year” rainfall could now happen far more frequently—as often as every 5 to 10 years.

The outdated analysis has serious implications for the way infrastructure projects are initiated and designed. And, because FEMA’s federal flood insurance program greatly underrepresents the number of people that could fall into FEMA’s Special Flood Hazard Areas, millions of Americans may be unaware of their current flood risk.

Inaccurate flood risk data due to underestimating the impact of rainfall also impacts the cost and availability of flood insurance—this is especially true for property that isn’t close to the ocean or inland bodies of water.

The government is working to remedy the situation, though. NOAA, as reported by CNN, says it is working on a revamped approach to its rainfall analysis that is expected to be completed in 2027.

Related Stories

Codes and Standards | Jan 25, 2021

New guide for skylight selection, daylighting design released

Free Fenestration and Glazing Industry Alliance document now available.

Codes and Standards | Jan 20, 2021

Steel industry, labor urge Biden to retain steel tariffs

‘Essential to ensuring the viability of the domestic steel industry.’

Codes and Standards | Jan 19, 2021

2021 Solar Investment Tax Credit will remain at 26%

Incentive was scheduled to be reduced to 22%.

Codes and Standards | Jan 19, 2021

Thomas Jefferson University launches the Institute for Smart and Healthy Cities

Will address climate change, social equity, rapid urbanization, and health.

Codes and Standards | Jan 14, 2021

Petition urges FEMA to update flood maps, set tougher standards for floodplain construction

Environmental and planning groups note soaring claims, flood insurance debt.

Codes and Standards | Jan 13, 2021

Proposed change to IECC process irks efficiency advocates

New procedure would diminish influence of local code officials.

Codes and Standards | Jan 12, 2021

Two net-zero hotel projects could portend a new hospitality trend

Energy-intensive sector comprises 10% of all commercial real estate.

Codes and Standards | Jan 11, 2021

Zero Energy Buildings growth driven by government policy, stringent codes, technologies

Restraints include high upfront cost, and lack of universal definition and approaches.

Codes and Standards | Jan 11, 2021

HUD releases new Fair Housing Act design and construction requirements

First update of ‘safe harbors’ in 15 years provides better clarity for design and construction firms.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021