flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA’s top 10 workplace safety violations for 2015

Contractors

OSHA’s top 10 workplace safety violations for 2015

Fall protection, hazard communication lead the list.


By Peter Fabris, Contributing Editor | October 2, 2015
OSHA’s announces Top 10 Violations for 2015

Scaffolding on a building in Cincinnati, Ohio. OSHA listed scaffolding as a frequent workplace safety hazard.

The Occupational Safety and Health Administration (OSHA) announced its preliminary Top 10 most frequently cited workplace safety violations for fiscal year 2015. 

"In injury prevention, we go where the data tell us to go," said National Safety Council President and CEO Deborah A.P. Hersman. "The OSHA Top 10 list is a roadmap that identifies the hazards you want to avoid on the journey to safety excellence."

The Top 10 hazards for FY 2015 are:

  1. Fall Protection – 6,721
  2. Hazard Communication – 5,192
  3. Scaffolding – 4,295
  4. Respiratory Protection – 3,305
  5. Lockout/Tagout – 3,002
  6. Powered Industrial Trucks – 2,760
  7. Ladders – 2,489
  8. Electrical – Wiring Methods – 2,404
  9. Machine Guarding – 2,295
  10. Electrical – General Requirements – 1,973

The final report on the Top 10 violations for 2015 will be published in the December edition of the Council's Safety+Health magazine.

Related Stories

| Feb 27, 2014

PocketCake lunches CPU designed for virtual reality simulations

The company's Virtual Reality Simulation Converter Assembly is three times more powerful than the average high-performance computer and allows for up to eight people to experience a virtual reality simulation at the same time.

| Feb 26, 2014

Adaptive reuse project brings school into historic paper mill

The project features nontraditional classrooms for collaborative learning, an arts and music wing, and a technologically sophisticated global resource center.

| Feb 26, 2014

Startup PocketCake aims to bring virtual reality simulations to the AEC masses

Founded in 2012, the development firm offers custom virtual reality simulations for the price of a typical architectural illustration.

| Feb 26, 2014

Billie Jean King National Tennis Center serving up three-phase expansion

The project includes the construction of two new stadiums and a retractable roof over the existing Arthur Ashe Stadium. 

| Feb 24, 2014

First look: UC San Diego opens net-zero biological research lab

The facility is intended to be "the most sustainable laboratory in the world," and incorporates natural ventilation, passive cooling, high-efficiency plumbing, and sustainably harvested wood.  

| Feb 21, 2014

Naturally ventilated hospital planned in Singapore

The Ng Teng Fong General Hospital will take advantage of the region's prevailing breezes to cool the spaces. 

| Feb 21, 2014

Calatrava ordered to pay millions for 'shortcomings in his work' on conference center project

Famed architect Santiago Calatrava must pay 2.9 million euros due to faulty design work on the Palacio de Congresos project in Oviedo, Spain. 

| Feb 19, 2014

Why you should start with a builder, part two

When it’s time to build or expand, the first step is finding a builder that fits your needs. Once you have found a builder, checked their references, visited with their previous clients and are ready to move forward, the next step is answering an initial set of questions that will direct your project.

| Feb 19, 2014

Obama Administration moves to boost fuel efficiency standards on heavy-duty vehicles

The Obama Administration wants to boost fuel efficiency of medium- and heavy-duty trucks for models made in 2019 and later.

| Feb 19, 2014

Slight rebound for Architecture Billings Index

After consecutive months of contracting demand for design services, AIA's Architecture Billings Index inched up nearly two points to 50.4 in January, indicating favorable business conditions.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021