flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA suspends electronic injury, illness reporting requirement

Codes and Standards

OSHA suspends electronic injury, illness reporting requirement

The agency is keeping records from being publicly disclosed—for now.


By Peter Fabris, Contributing Editor | May 30, 2017
OSHA suspends electronic injury, illness reporting requirement

Photo: Pixabay

The Occupational Safety and Health Administration has suspended an Obama-era rule requiring that companies electronically report their injury and illness records.

The action prevents these records from being publicly disclosed for the immediate future. Industry groups, including the Associated Builders & Contractors, Associated General Contractors of America, and the National Association of Home Builders, had challenged the 2016 Occupational Safety and Health Administration rule in court.

The organizations had also lobbied the Trump Administration to arguing that the rule could unfairly damage the reputations of some companies. Companies have been required to maintain worker injury and illness logs since 1971.

Between 1995 and 2012, OSHA had required about 180,000 organizations in high-hazard industries such as manufacturing and nursing homes to submit summary data by mail. Officials decided to expand the requirement and convert it to an electronic system to save money. An OSHA spokeswoman said that the agency delayed the rule to address employers’ “concerns about meeting their reporting obligations” in time, according to the Washington Post.

Related Stories

Libraries | Jul 20, 2022

Canada to open one of the world’s largest library and archive facilities

When it opens in 2026, Ādisōke is expected to be one of the largest library and archive facilities in the world. 

Energy-Efficient Design | Jul 19, 2022

All is not lost: 3 ways architects can respond to the Supreme Court’s EPA ruling

The U.S. Supreme Court’s ruling to limit the Environmental Protection Agency’s power to regulate greenhouse gas (GHG) emissions from power plants dealt a significant blow to our ability to fight the climate crisis with federal policy.

Office Buildings | Jul 19, 2022

Austin adaptive reuse project transforms warehouse site into indoor-outdoor creative office building

Fifth and Tillery, an adaptive reuse project, has revitalized a post-industrial site in East Austin, Texas.

Women in Design+Construction | Jul 18, 2022

Registration is open for BD+C's 2022 Women in Design+Construction Conference

Join your AEC industry peers in Chicago, September 26-28, 2022, for the 7th annual Women in Design+Construction Conference, hosted by the BD+C editorial team and the 35-person WIDC Advisory Board. 

Airports | Jul 18, 2022

FAA will award nearly $1 billion for airport projects

The Federal Aviation Administration (FAA) will award nearly $1 billion to 85 airports of all sizes across the country to improve terminals.

Building Team | Jul 18, 2022

Understanding the growing design-build market

FMI’s new analysis of the design-build market forecast for the next fives years shows that this delivery method will continue to grow, despite challenges from the COVID-19 pandemic.

Mixed-Use | Jul 18, 2022

Mixed-use development outside Prague uses a material made from leftover bricks

Outside Prague, the Sugar Factory, a mixed-used residential development with public space, marks the largest project to use the sustainable material Rebetong. 

Building Team | Jul 15, 2022

ABC: Construction materials prices increased in June, up 20% from a year ago

Construction input prices increased 1.9% in June compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics’ Producer Price Index data released today.

Arenas | Jul 15, 2022

U. of Oregon renovation aims for ‘finest track and field facility in the world’

The renovation of the University of Oregon’s Hayward Field had the goal of creating the “finest track and field facility in the world.”

Building Team | Jul 14, 2022

ABC’s construction backlog inches lower in June; Contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator fell 0.1 months in June and stands at 8.9 months, according to an ABC member survey conducted June 21 to July 5.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021