flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA suspends electronic injury, illness reporting requirement

Codes and Standards

OSHA suspends electronic injury, illness reporting requirement

The agency is keeping records from being publicly disclosed—for now.


By Peter Fabris, Contributing Editor | May 30, 2017
OSHA suspends electronic injury, illness reporting requirement

Photo: Pixabay

The Occupational Safety and Health Administration has suspended an Obama-era rule requiring that companies electronically report their injury and illness records.

The action prevents these records from being publicly disclosed for the immediate future. Industry groups, including the Associated Builders & Contractors, Associated General Contractors of America, and the National Association of Home Builders, had challenged the 2016 Occupational Safety and Health Administration rule in court.

The organizations had also lobbied the Trump Administration to arguing that the rule could unfairly damage the reputations of some companies. Companies have been required to maintain worker injury and illness logs since 1971.

Between 1995 and 2012, OSHA had required about 180,000 organizations in high-hazard industries such as manufacturing and nursing homes to submit summary data by mail. Officials decided to expand the requirement and convert it to an electronic system to save money. An OSHA spokeswoman said that the agency delayed the rule to address employers’ “concerns about meeting their reporting obligations” in time, according to the Washington Post.

Related Stories

| Feb 27, 2014

Metal Construction Association introduces two Environmental Product Declarations

Two Environmental Product Declarations (EPD), one for Metal Composite Material Panels and one for  Roll Formed Steel Panels for Roofs and Walls, are now available free of charge from the Metal Construction Association (MCA) on its website.

| Feb 27, 2014

Bluebeam Software launches Revu 12 for better field-ready document management and project collaboration

The latest version of the company’s flagship solution better enables users in document-intensive industries to digitally collaborate on project documents and more easily connect the office to the field.

| Feb 27, 2014

PocketCake lunches CPU designed for virtual reality simulations

The company's Virtual Reality Simulation Converter Assembly is three times more powerful than the average high-performance computer and allows for up to eight people to experience a virtual reality simulation at the same time.

| Feb 26, 2014

Adaptive reuse project brings school into historic paper mill

The project features nontraditional classrooms for collaborative learning, an arts and music wing, and a technologically sophisticated global resource center.

| Feb 26, 2014

Startup PocketCake aims to bring virtual reality simulations to the AEC masses

Founded in 2012, the development firm offers custom virtual reality simulations for the price of a typical architectural illustration.

| Feb 26, 2014

Billie Jean King National Tennis Center serving up three-phase expansion

The project includes the construction of two new stadiums and a retractable roof over the existing Arthur Ashe Stadium. 

| Feb 24, 2014

First look: UC San Diego opens net-zero biological research lab

The facility is intended to be "the most sustainable laboratory in the world," and incorporates natural ventilation, passive cooling, high-efficiency plumbing, and sustainably harvested wood.  

| Feb 21, 2014

Naturally ventilated hospital planned in Singapore

The Ng Teng Fong General Hospital will take advantage of the region's prevailing breezes to cool the spaces. 

| Feb 21, 2014

Calatrava ordered to pay millions for 'shortcomings in his work' on conference center project

Famed architect Santiago Calatrava must pay 2.9 million euros due to faulty design work on the Palacio de Congresos project in Oviedo, Spain. 

| Feb 19, 2014

Why you should start with a builder, part two

When it’s time to build or expand, the first step is finding a builder that fits your needs. Once you have found a builder, checked their references, visited with their previous clients and are ready to move forward, the next step is answering an initial set of questions that will direct your project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021