flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA proposes $2.3 million in fines against Olivet Management for exposing workers to asbestos and lead

OSHA proposes $2.3 million in fines against Olivet Management for exposing workers to asbestos and lead

Exposure occurred during renovation of former Harlem Valley Psychiatric Center in New York


By BD+C Staff | April 16, 2014
Photo: Chmee2 via Wikimedia Commons
Photo: Chmee2 via Wikimedia Commons

Olivet Management LLC, a real estate development and management company, faces $2.3 million in proposed fines from the Occupational Safety and Health Administration.

OSHA says the company exposed its own employees, as well as employees for 13 contractors, to asbestos and lead hazards during cleanup operations at the former Harlem Valley Psychiatric Center in Dover Plains, N.Y., prior to a tour of the site by potential investors.

“Olivet knew that asbestos and lead were present at this site, yet the company chose to ignore its responsibility to protect its own workers and contractors,” said U.S. Secretary of Labor Thomas E. Perez. “The intolerable choice this company made put not only workers, but also their families, in danger.”

OSHA determined that Olivet knowingly failed to take basic safety precautions and did not inform their own employees or contractors about the presence of asbestos and lead, despite knowing that both hazards existed. OSHA says the workers were exposed during removal of asbestos- and lead-contaminated debris, asbestos floor tiles and insulation, and lead paint from walls, windows, door frames, and other painted surfaces.

Olivet, OSHA alleges, did not: monitor workers’ exposure levels; provide appropriate respiratory protection; nor post notices, warning signs and labels to alert workers and contractors to the presence of asbestos and lead. The company also did not provide clean changing and decontamination areas for workers, many of whom wore their contaminated clothing home to households with small children, OSHA says.

In January, the U.S. Environmental Protection Administration ordered Olivet to stop all work that could disturb asbestos at the facility; and it is continuing to investigate the case.

(https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=NEWS_RELEASES&p_id=25812)

Related Stories

Codes and Standards | Jan 26, 2021

Updated guide to repair and rehabilitate existing concrete structures published

Document assesses how to adhere to code requirements.

Codes and Standards | Jan 25, 2021

New guide for skylight selection, daylighting design released

Free Fenestration and Glazing Industry Alliance document now available.

Codes and Standards | Jan 20, 2021

Steel industry, labor urge Biden to retain steel tariffs

‘Essential to ensuring the viability of the domestic steel industry.’

Codes and Standards | Jan 19, 2021

2021 Solar Investment Tax Credit will remain at 26%

Incentive was scheduled to be reduced to 22%.

Codes and Standards | Jan 19, 2021

Thomas Jefferson University launches the Institute for Smart and Healthy Cities

Will address climate change, social equity, rapid urbanization, and health.

Codes and Standards | Jan 14, 2021

Petition urges FEMA to update flood maps, set tougher standards for floodplain construction

Environmental and planning groups note soaring claims, flood insurance debt.

Codes and Standards | Jan 13, 2021

Proposed change to IECC process irks efficiency advocates

New procedure would diminish influence of local code officials.

Codes and Standards | Jan 12, 2021

Two net-zero hotel projects could portend a new hospitality trend

Energy-intensive sector comprises 10% of all commercial real estate.

Codes and Standards | Jan 11, 2021

Zero Energy Buildings growth driven by government policy, stringent codes, technologies

Restraints include high upfront cost, and lack of universal definition and approaches.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021