flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA proposes $2.3 million in fines against Olivet Management for exposing workers to asbestos and lead

OSHA proposes $2.3 million in fines against Olivet Management for exposing workers to asbestos and lead

Exposure occurred during renovation of former Harlem Valley Psychiatric Center in New York


By BD+C Staff | April 16, 2014
Photo: Chmee2 via Wikimedia Commons
Photo: Chmee2 via Wikimedia Commons

Olivet Management LLC, a real estate development and management company, faces $2.3 million in proposed fines from the Occupational Safety and Health Administration.

OSHA says the company exposed its own employees, as well as employees for 13 contractors, to asbestos and lead hazards during cleanup operations at the former Harlem Valley Psychiatric Center in Dover Plains, N.Y., prior to a tour of the site by potential investors.

“Olivet knew that asbestos and lead were present at this site, yet the company chose to ignore its responsibility to protect its own workers and contractors,” said U.S. Secretary of Labor Thomas E. Perez. “The intolerable choice this company made put not only workers, but also their families, in danger.”

OSHA determined that Olivet knowingly failed to take basic safety precautions and did not inform their own employees or contractors about the presence of asbestos and lead, despite knowing that both hazards existed. OSHA says the workers were exposed during removal of asbestos- and lead-contaminated debris, asbestos floor tiles and insulation, and lead paint from walls, windows, door frames, and other painted surfaces.

Olivet, OSHA alleges, did not: monitor workers’ exposure levels; provide appropriate respiratory protection; nor post notices, warning signs and labels to alert workers and contractors to the presence of asbestos and lead. The company also did not provide clean changing and decontamination areas for workers, many of whom wore their contaminated clothing home to households with small children, OSHA says.

In January, the U.S. Environmental Protection Administration ordered Olivet to stop all work that could disturb asbestos at the facility; and it is continuing to investigate the case.

(https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=NEWS_RELEASES&p_id=25812)

Related Stories

Codes and Standards | Jun 1, 2021

Federal plan to double Canadian lumber tariffs draws intense criticism

Builders advised to stock up to deal with shortages.

Codes and Standards | Jun 1, 2021

Passive House standards proving their worth in multifamily sector

Energy performance beats conventionally built by 32% to 58%.

Codes and Standards | May 27, 2021

Pittsburgh combats construction fraud

Crackdown on tax, insurance, and workers’ comp malfeasance.

Codes and Standards | May 26, 2021

Proposal to add photovoltaic panels to the R2 Standard for electronics recycling

Hundreds of facilities in 33 countries could begin recycling PVs.

Codes and Standards | May 25, 2021

International Energy Agency lays out roadmap to net zero

Focus is on energy generation, but building efficiency also plays a role.

Codes and Standards | May 24, 2021

Biden Administration will make new investments in building energy efficiency

Focus on grid-interactive buildings; Energy Star expansion; new targets for energy, water reduction.

Codes and Standards | May 20, 2021

Solar panel trade group issues guidelines to rid use of components built with forced labor

Growing concern that PV industry is dependent on work camps in China.

Codes and Standards | May 19, 2021

Smart electric panels can aid transition to renewable energy

Allow customers better control of circuits; utilities can better manage demand.

Codes and Standards | May 18, 2021

Cross-laminated timber performs better than expected in shear test

Tests conducted in support of new criteria for design of CLT diaphragm.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021