flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA proposes $2.3 million in fines against Olivet Management for exposing workers to asbestos and lead

OSHA proposes $2.3 million in fines against Olivet Management for exposing workers to asbestos and lead

Exposure occurred during renovation of former Harlem Valley Psychiatric Center in New York


By BD+C Staff | April 16, 2014
Photo: Chmee2 via Wikimedia Commons
Photo: Chmee2 via Wikimedia Commons

Olivet Management LLC, a real estate development and management company, faces $2.3 million in proposed fines from the Occupational Safety and Health Administration.

OSHA says the company exposed its own employees, as well as employees for 13 contractors, to asbestos and lead hazards during cleanup operations at the former Harlem Valley Psychiatric Center in Dover Plains, N.Y., prior to a tour of the site by potential investors.

“Olivet knew that asbestos and lead were present at this site, yet the company chose to ignore its responsibility to protect its own workers and contractors,” said U.S. Secretary of Labor Thomas E. Perez. “The intolerable choice this company made put not only workers, but also their families, in danger.”

OSHA determined that Olivet knowingly failed to take basic safety precautions and did not inform their own employees or contractors about the presence of asbestos and lead, despite knowing that both hazards existed. OSHA says the workers were exposed during removal of asbestos- and lead-contaminated debris, asbestos floor tiles and insulation, and lead paint from walls, windows, door frames, and other painted surfaces.

Olivet, OSHA alleges, did not: monitor workers’ exposure levels; provide appropriate respiratory protection; nor post notices, warning signs and labels to alert workers and contractors to the presence of asbestos and lead. The company also did not provide clean changing and decontamination areas for workers, many of whom wore their contaminated clothing home to households with small children, OSHA says.

In January, the U.S. Environmental Protection Administration ordered Olivet to stop all work that could disturb asbestos at the facility; and it is continuing to investigate the case.

(https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=NEWS_RELEASES&p_id=25812)

Related Stories

Codes and Standards | Jan 10, 2022

New ratings services focus on climate risk for homeowners

Efficacy of models used in risk assessment varies.

Codes and Standards | Jan 6, 2022

Virginia contractors having a tough time finding diverse subs to meet state goals

Survey of primes may indicate similar issues at federal level.

Codes and Standards | Jan 5, 2022

Boston drops parking requirements for affordable housing

Measure expected to spur new projects.

Codes and Standards | Jan 4, 2022

Dept. of Energy Better Climate Challenge aims for 50% GHG emission reduction by 2030

Program offers technical assistance and peer-to-peer knowledge sharing.

Codes and Standards | Jan 4, 2022

Architects at New York firm take steps to unionize

Support for unionization reported at two other New York firms.

Codes and Standards | Jan 3, 2022

Biden’s executive order for a carbon-neutral government includes green materials mandate

As a driver of demand, federal procurement impact could ripple through the economy.

Codes and Standards | Jan 3, 2022

Controversial California solar power incentive proposal would reduce subsidies

Plan intended to encourage customers to install power storage systems.

Codes and Standards | Jan 3, 2022

New York City bans new gas hookups

Applies to gas stoves, boilers, and heaters in new buildings and buildings that undergo gut renovations.

Codes and Standards | Jan 3, 2022

New engineering guide on fire safety for very tall buildings released

Topics include emergency egress, fire resistance, building envelope, suppression, detection, alarms, and smoke control.

Codes and Standards | Dec 22, 2021

Updated ASCE 7-22 standard includes first-ever criteria for tornado-resistant design

New document provides up-to-date, coordinated loading provisions for general structural design.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021