flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA increases penalties on South Dakota contractor after fatal building collapse

Codes and Standards

OSHA increases penalties on South Dakota contractor after fatal building collapse

Agency issues over $300,000 in fines for ‘willful’ safety violations.


By Peter Fabris, Contributing Editor | May 10, 2017

Don Graham, flickr Creative Commons

The Occupational Safety and Health Administration issued multiple citations for safety violations to a South Dakota contractor after a building collapse that killed a worker.

The incident occurred in December 2016 when Hultgren Construction directed crews to remove two load-bearing walls. That action led to the collapse of the Copper Lounge building.

Hultgren did not instruct workers on how to set up appropriate temporary supports, OSHA alleges. The agency also says that Hultgren did not conduct an engineering survey prior to demolition.

Last month OSHA issued multiple violations and about $214,000 in fines to Hultgren and labor staffing company Command Center for failing to properly train workers in safety procedures and not providing adequate personal protective equipment. In early May, the agency added two more “willful” citations, and added $101,400 more in fines to the penalty.

Related Stories

Codes and Standards | Oct 24, 2019

ASHRAE design contest winners demonstrate building resilience

Model building, a city hall, could operate without utility service for two weeks.

Codes and Standards | Oct 22, 2019

Efficient material design, low-carbon concrete are critical to cutting GHG emissions in construction

Enhancing building utilization and reusing materials also aid carbon reduction.

Codes and Standards | Oct 18, 2019

St. Louis could save $61 million per year in energy costs by improved building performance

GHG gases can be reduced by at least 11% with upgrades to public buildings and large private buildings.

Codes and Standards | Oct 17, 2019

Slow payments cost GCs and subs $64 billion annually

Study finds 51-day average payment turnaround.

Codes and Standards | Oct 16, 2019

Cool pavement can make people hotter

Reflective coatings channel sunlight raising temperatures where pedestrians walk.

Codes and Standards | Oct 15, 2019

Utah adopts 2018 International Energy Conservation Code

Provisions include increased building envelope performance and reduced air infiltration.

Codes and Standards | Oct 14, 2019

States continue to beef up energy efficiency codes

ACEEE 50-state scorecard finds latest IECC code gaining adherents.

Codes and Standards | Oct 9, 2019

DOE releases Better Buildings Healthcare Financing Primer

Outlines financial strategies to implement energy-efficiency projects in healthcare.

Codes and Standards | Oct 8, 2019

Zero Carbon Buildings for All aims for ambitious emission reduction targets

Organization makes commitment to net zero carbon for all buildings by 2050.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021