flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA delays enforcing crystalline silica standard in construction industry

Codes and Standards

OSHA delays enforcing crystalline silica standard in construction industry

Enforcement will begin Sept. 23, three months later than planned. 


By Peter Fabris, Contributing Editor | April 17, 2017

Wikimedia Commons Public Domain, National Institute of Occupational Safety and Health

The Occupational Safety and Health Administration will delay enforcement of the crystalline silica standard that applies to the construction industry.

The agency says that additional guidance is necessary due to the unique nature of the requirements in the construction standard. It will conduct additional outreach and provide educational materials and guidance for employers.

Originally scheduled to begin June 23, 2017, enforcement will now begin Sept. 23, 2017. OSHA expects employers in the construction industry to continue to “take steps either to come into compliance with the new permissible exposure limit, or to implement specific dust controls for certain operations as provided in Table 1 of the standard.”

Construction employers should also continue to prepare to implement the standard’s other requirements, including exposure assessment, medical surveillance and employee training.

Related Stories

| Aug 2, 2012

More than 250 downtown El Paso, Texas buildings don’t meet safety codes, says city’s fire department

A total of 726 buildings were inspected for unsafe conditions, and 266 did not meet safety codes, while 112 buildings were found to be vacant and needed further inspection.

| Jul 26, 2012

Wisconsin may establish stormwater storage requirement for green roofs

Green roofs and other green infrastructure would be required to capture stormwater under a draft state wastewater discharge permit from the Milwaukee Metropolitan Sewerage District.

| Jul 26, 2012

SouthPark Mall in Charlotte reopens after heavy rains collapse part of its roof

Code enforcement officials in Charlotte, NC gave the okay for the SouthPark Mall to reopen after two parts of its roof collapsed following heavy rains last week.

| Jul 26, 2012

New NRCA photovoltaic roof systems guidelines released

The National Roofing Contractors Association’s update of its Guidelines for Roof Systems With Rooftop Photovoltaic Components is now available.

| Jul 26, 2012

DOE/ASHRAE design guide aims to cut energy use at hospitals, schools, retail stores

The Advanced Energy Design Guidelines from the Department of Energy and the American Society of Heating, Refrigerating and Air Conditioning Engineers aims to provide ways for hospitals, schools, and large retail buildings to trim their energy consumption by 50%.

| Jul 19, 2012

Bayview Property Managers agrees to record $800,000 building code fine

A San Francisco property-management company has agreed to pay a record $800,000 civil fine for hundreds of building code violations at rental properties.

| Jul 19, 2012

Glass ‘biodome’ helps Parkview Green FangCaoDi project in Beijing achieve LEED Platinum

A glass envelope acting as a kind of biodome encapsulates four mixed-use towers at Parkview Green FangCaoDi, an 800,000 sf mixed-use development in Beijing. The glass structure helped the development to achieve LEED Platinum certification.

| Jul 19, 2012

UMass-Boston's Bevington: 'Financing alternatives crucial to energy-efficiency upgrades'

It’s conceivable that innovation in project finance can do for building efficiency in the coming century what 30-year mortgages did for home ownership in the last, this article asserts.  

| Jul 19, 2012

NYC eases building code to create ‘micro apartments’ in Kips Bay

New York City has implemented a program to encourage construction of "micro-apartments" in the Big Apple, where rents are exorbitant and the number of singles is on the rise.

| Jul 19, 2012

NRCA: Roofing insulation performance, local climate keys to computing R-value

To minimize the loss of thermal resistance in design, the R-value of roof insulation should be computed based on the actual performance of the insulation material and the local climate, says the National Roofing Contractors Association.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021