flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OSHA announces new requirements for reporting deaths and severe injuries

OSHA announces new requirements for reporting deaths and severe injuries

Fatalities must be reported within eight hours; rule in effect Jan. 1


September 18, 2014

The U.S. Department of Labor's Occupational Safety and Health Administration announced a final rule requiring employers to notify OSHA when an employee is killed on the job or suffers a work-related hospitalization, amputation, or loss of an eye. The rule goes into effect on Jan. 1, 2015.

Under the revised rule, employers will be required to notify OSHA of work-related fatalities within eight hours, and work-related in-patient hospitalizations, amputations or losses of an eye within 24 hours. Previously, OSHA's regulations required an employer to report only work-related fatalities and in-patient hospitalizations of three or more employees. Reporting single hospitalizations, amputations or loss of an eye was not required under the previous rule.

The announcement followed the release of preliminary results from the Bureau of Labor Statistics' 2013 National Census of Fatal Occupational Injuries that reported 4,405 workers killed on the job in 2013. All employers covered by the Occupational Safety and Health Act, even those who are exempt from maintaining injury and illness records, are required to comply with OSHA's new severe injury and illness reporting requirements. To assist employers, OSHA is developing a Web portal for employers to report incidents electronically, in addition to phone reporting options.

(https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=NEWS_RELEASES&p_id=26673)

Related Stories

| Jun 5, 2014

Insurance giant sues nearly 200 Illinois communities for failing to prepare for climate change

Farmers Insurance filed nine class action suits against nearly 200 communities in the Chicago area, saying that local governments should have prepared for rising global temperatures that have led to heavier rains and flooding.

| Jun 4, 2014

Dikes, water pumps, and parks will help New York City area be more resilient

The Obama Administration has pledged $1 billion in federal funding to protect the New York City region from flooding like the area experienced from Superstorm Sandy.

| Jun 4, 2014

Green initiative may scuttle high-rise projects in Berkeley, California, critics charge

Volunteers in Berkeley, Calif., are collecting signatures for the “Green Downtown & Public Commons Initiative,” a controversial measure that critics charge would halt some development in the city.

| Jun 2, 2014

Parking structures group launches LEED-type program for parking garages

The Green Parking Council, an affiliate of the International Parking Institute, has launched the Green Garage Certification program, the parking industry equivalent of LEED certification.

| May 28, 2014

Commercial building measurement standard could meet resistance from owners

For some building owners, a new measurement standard could mean that their building would shrink in size and lose value.

| May 28, 2014

Resiliency measures for hurricanes can help with tornadoes

Architect Butch Grimes, who examined the wreckage after a half-mile tornado struck Tuscaloosa, Ala., believes toughening building codes can reduce damage from twisters.

| May 28, 2014

Rooftop wind turbines becoming green status symbol in New York City

New York City developers are using rooftop wind turbines in an effort to attract buyers by highlighting a building’s green credentials.

| May 28, 2014

Peer review process under way for the WELL Building Standard

The standard is the first protocol of its kind that focuses on improving human wellness within the built environment by identifying specific conditions that, when holistically integrated into building interiors, enhance the health and wellbeing of the occupants.

| May 22, 2014

ASHRAE releases best practice guide for liquid cooling systems in data centers

The publication provides guidelines on interface requirements between chilled-water systems and technology cooling systems and on the requirements of liquid-cooled systems that attach to a datacom electronics rack.

| May 22, 2014

Colorado approves $4.2B data center said to be invulnerable to power outages

The Niobrara Data Center Energy Park project in Colorado will be the first data center to be fully self-contained with its own self-generated energy production facility.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021