flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ontario planning to spend $7 billion on wide-ranging climate change plan

Codes and Standards

Ontario planning to spend $7 billion on wide-ranging climate change plan

Includes financial incentives to retrofit buildings.


By Peter Fabris, Contributing Editor | May 24, 2016
Ontario planning to spend $7-billion on wide-ranging climate change plan

Mississauga, Ontario. Photo: Robert Linsdell/Creative Commons

The Ontario provincial government is planning to spend more than $7 billion over four years on a comprehensive climate change initiative that will include incentives for energy efficiency building retrofits, according to a report in the Globe and Mail.

The plan, aimed at reducing Ontario’s carbon footprint, will also include:

  • Phasing out natural gas for heating 
  • Rebates to drivers who buy electric vehicles 
  • Requirements that gasoline sold in the province contain less carbon 
  • Building code changes to require all new homes to be heated with electricity or geothermal systems by 2030 
  • A target for 12% of all new vehicle sales to be electric by 2025

Some $3.8 billion will be available for new grants, rebates, and other subsidies to retrofit buildings, and to move heating from natural gas to geothermal, solar power, or other forms of electric heat. Many of these programs will be administered by a new Green Bank, modeled on a similar agency in New York State.

The plan may still be fine-tuned, and will be officially released to the public in June, the Globe and Mail reported.

Related Stories

| Dec 15, 2011

NRDC charges Maine governor with weakening green wood requirement

The FSC program is administered through the Leadership in Energy and Environmental Design (LEED) and requires wood to be harvested in a sustainable way.

| Dec 15, 2011

Post-tornado, Tuscaloosa seeks to create walkable urban, retail areas

Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet.

| Dec 15, 2011

Allentown, Pa. city council asked to repeal union-friendly law

The mayor of Allentown, Pa. asked the City Council to repeal a year-old ordinance that forces contractors to hire union workers for large city projects funded with state and federal dollars.

| Dec 13, 2011

LEED-EB outpaces LEED for new construction

The U.S. Green Building Council's (USGBC's) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 13, 2011

Regulators charge pervasive abuse of construction workers in Connecticut

Federal and state regulators say they have uncovered what they call "widespread noncompliance" with minimum wage and overtime laws in Connecticut's construction industry.

| Dec 13, 2011

Philadelphia mayor signs order for project labor agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

| Dec 13, 2011

Improved code requirements for attic ventilation

The Roof Assembly Ventilation Coalition (RAVC) participated in the development of the code.

| Dec 12, 2011

LEED-EB Outpaces LEED for New Construction

The U.S. Green Building Council’s (USGBC’s) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 12, 2011

Philadelphia Mayor Signs Order for Project Labor Agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

| Dec 12, 2011

Improved Code Requirements for Attic Ventilation

The International Code Council (ICC) recently published the 2012 International Residential Code (IRC) that includes improved code requirements for balanced intake and exhaust for ventilated attics.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021