flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ontario code changes boost accessibility for people with disabilities

Ontario code changes boost accessibility for people with disabilities

Applies to new projects and substantial renovations


January 14, 2015

The new amended Ontario building code includes several provisions that improve accessibility for those with disabilities.

The changes include power door operators at entrances to more buildings and at barrier-free washrooms and common rooms in multi-unit residential buildings. The code also requires more accessible and adaptable seating spaces in public buildings such as theatres, lecture halls, and churches. New public pools and spas also must be barrier-free.

The amendments were spurred from the 2005 Accessibility for Ontarians with Disabilities Act that set a target date of 2025 for “an accessible province.” The leader of an advocacy group warned that the pace of change is so slow the government is unlikely to meet its 2025 target, though.

The revamped Ontario building code also helps communities prepare for an aging population, a provincial government spokesman said.

(http://www.sunnewsnetwork.ca/sunnews/politics/archives/2015/01/20150101-132413.html)

Related Stories

Codes and Standards | Jul 12, 2017

New International Building Code allows weather-resistive barriers above 40 feet

Danger of propagating flames now deemed negligible.

Codes and Standards | Jul 10, 2017

New mass plywood panel project moves ahead with federal grant

New material is substitute for concrete and steel in multi-story projects.

Codes and Standards | Jul 6, 2017

Trump ups ante on apprenticeships, gives private sector more room to design them

Initiative aimed at alleviating construction industry worker shortage.

Codes and Standards | Jul 6, 2017

Flawed modeling to blame for green buildings failure to live up to hype on energy efficiency

Explains energy performance gap from expected savings to actual savings.

Codes and Standards | Jul 5, 2017

Research study examines tall timber buildings worldwide

Industry group developing criteria for categorizing wide range of construction approaches to tall timber buildings.

Codes and Standards | Jun 30, 2017

AAMA releases new document on aluminum fenestration and energy efficiency

The free download addresses entrances, storefront framing, curtain walls, windows and skylight fenestration systems.

Codes and Standards | Jun 29, 2017

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Reports suggest an extra $6,300 for fire-resistant cladding could have prevented the tragedy.

Codes and Standards | Jun 28, 2017

Minimum Design Loads and Associated Criteria for Buildings and Other Structures, Standards ASCE/SEI 7-16, has been updated

The document is used for determining design loads including dead, live, soil, flood, tsunami, snow, rain, atmospheric ice, earthquake, wind, and fire.

Codes and Standards | Jun 27, 2017

Cold-formed steel framing engineering guide for building projects released

Better sound attenuation for subfloors and exterior continuous insulation are among the matters addressed.

Codes and Standards | Jun 26, 2017

L.A.’s new ordinance requires energy and water efficiency benchmarking

Structures 20,000 sf and larger must demonstrate steps to boost efficiency.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021