flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

One World Trade Center cuts rents due to sluggish activity

One World Trade Center cuts rents due to sluggish activity

WSJ reports that no private tenant has signed a lease in the iconic tower for nearly three years.


By BD+C Staff | May 27, 2014
One World Trade Center, courtesy Cushman & Wakefield
One World Trade Center, courtesy Cushman & Wakefield

One World Trade Center, soaring to 1,776 feet and set to open by year's end, is having difficulty attracting tenants, according to a report in the Wall Street Journal.

Developer The Durst Organization and the Port Authority of New York and New Jersey have reduced asking rents for larger tenants to $69/sf, down from $75.

The 3.1 million-sf project—originally known as Freedom Tower—is reportedly the most expensive office tower ever built, at a construction cost of $3.9 billion. It is currently about 55% leased, according to the Wall Street Journal. Current large deals in downtown New York City have been made in the $50 to $60/sf range, making One World Trade unusually expensive for the market. The building is the largest in the Western Hemisphere and was designed by David Childs of Skidmore, Owings & Merrill after an initial concept was developed in Daniel Lieskind's master plan for the site.

Meanwhile, developer Larry Silverstein is still contemplating building an office tower named 3 World Trade on the site, after completing the 2.3 million-sf 4 World Trade (opened last fall and now 51% leased). Insiders now doubt that the Port Authority will approve Silverstein's proposed deal in light of questions about the match between available space and potential demand.

 

 

Related Stories

| Apr 12, 2011

American Institute of Architects announces Guide for Sustainable Projects

AIA Guide for Sustainable Projects to provide design and construction industries with roadmap for working on sustainable projects.

| Apr 11, 2011

Wind turbines to generate power for new UNT football stadium

The University of North Texas has received a $2 million grant from the State Energy Conservation Office to install three wind turbines that will feed the electrical grid and provide power to UNT’s new football stadium. 

| Apr 8, 2011

SHW Group appoints Marjorie K. Simmons as CEO

Chairman of the Board Marjorie K. Simmons assumes CEO position, making SHW Group the only firm in the AIA Large Firm Roundtable to appoint a woman to this leadership position

| Apr 5, 2011

Zaha Hadid’s civic center design divides California city

Architect Zaha Hadid  is in high demand these days, designing projects in Hong Kong, Milan, and Seoul, not to mention the London Aquatics Center, the swimming arena for the 2012 Olympics. But one of the firm’s smaller clients, the city of Elk Grove, Calif., recently conjured far different kinds of aquatic life when members of the City Council and the public chose words like “squid,” “octopus,” and “starfish” to describe the latest renderings for a proposed civic center.

| Apr 5, 2011

Are architects falling behind on BIM?

A study by the National Building Specification arm of RIBA Enterprises showed that 43% of architects and others in the industry had still not heard of BIM, let alone started using it. It also found that of the 13% of respondents who were using BIM only a third thought they would be using it for most of their projects in a year’s time.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021