flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

One World Trade Center cuts rents due to sluggish activity

One World Trade Center cuts rents due to sluggish activity

WSJ reports that no private tenant has signed a lease in the iconic tower for nearly three years.


By BD+C Staff | May 27, 2014
One World Trade Center, courtesy Cushman & Wakefield
One World Trade Center, courtesy Cushman & Wakefield

One World Trade Center, soaring to 1,776 feet and set to open by year's end, is having difficulty attracting tenants, according to a report in the Wall Street Journal.

Developer The Durst Organization and the Port Authority of New York and New Jersey have reduced asking rents for larger tenants to $69/sf, down from $75.

The 3.1 million-sf project—originally known as Freedom Tower—is reportedly the most expensive office tower ever built, at a construction cost of $3.9 billion. It is currently about 55% leased, according to the Wall Street Journal. Current large deals in downtown New York City have been made in the $50 to $60/sf range, making One World Trade unusually expensive for the market. The building is the largest in the Western Hemisphere and was designed by David Childs of Skidmore, Owings & Merrill after an initial concept was developed in Daniel Lieskind's master plan for the site.

Meanwhile, developer Larry Silverstein is still contemplating building an office tower named 3 World Trade on the site, after completing the 2.3 million-sf 4 World Trade (opened last fall and now 51% leased). Insiders now doubt that the Port Authority will approve Silverstein's proposed deal in light of questions about the match between available space and potential demand.

 

 

Related Stories

| Jun 29, 2012

SOM writes a new chapter at Cincinnati’s The Christ Hospital

The 332,000–sf design draws on the predominantly red brick character of The Christ Hospital’s existing buildings, interpreting it in a fresh and contemporary manner that fits well within the historic Mt. Auburn neighborhood while reflecting the institution’s dedication to experience, efficiency, flexibility, innovation and brand.

| Jun 29, 2012

Benjamin Moore Paints announces new CEO

Robert S. Merritt comes to Benjamin Moore with over three decades of management experience in the restaurant and food preparation and distribution industries

| Jun 29, 2012

Guardian launches industry’s first glass visualizer for interior design

Online tool allows designers to explore the possibilities of glass.

| Jun 28, 2012

Federal applications of renewable energy

U.S. Army Fort Knox: Using the Earth for space heating and cooling. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) facilitates the Federal Government’s implementation of sound, cost-effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

| Jun 27, 2012

HDR opens office in Beijing

The Beijing office is HDR’s second location in China; the firm’s other office is in Shanghai.

| Jun 27, 2012

KBE Building wins honor for Armed Forces Reserve Center

The construction phase was completed in just 16 months.

| Jun 27, 2012

SOM’s Baker receives honorary doctorate in engineering from Heriot-Watt University

Baker recognized for his career and influential contribution in the field of structural engineering.

| Jun 25, 2012

Living green wall planned for InterContinental Chicago

Project, with price tag of $2 million to $3 million, needs council approval.

| Jun 25, 2012

AIA-NJ honors DMR Architects

The academic building, completed in 2009, provides classrooms, computer labs, faculty offices, and meeting spaces for the College, which has a steady 7% annual increase in enrollment.

| Jun 25, 2012

Thornton Tomasetti appoints Hofmeister and Zhu to board of directors

The addition of Hofmeister and Zhu brings the number of directors to 10.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021