flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

One World Trade Center cuts rents due to sluggish activity

One World Trade Center cuts rents due to sluggish activity

WSJ reports that no private tenant has signed a lease in the iconic tower for nearly three years.


By BD+C Staff | May 27, 2014
One World Trade Center, courtesy Cushman & Wakefield
One World Trade Center, courtesy Cushman & Wakefield

One World Trade Center, soaring to 1,776 feet and set to open by year's end, is having difficulty attracting tenants, according to a report in the Wall Street Journal.

Developer The Durst Organization and the Port Authority of New York and New Jersey have reduced asking rents for larger tenants to $69/sf, down from $75.

The 3.1 million-sf project—originally known as Freedom Tower—is reportedly the most expensive office tower ever built, at a construction cost of $3.9 billion. It is currently about 55% leased, according to the Wall Street Journal. Current large deals in downtown New York City have been made in the $50 to $60/sf range, making One World Trade unusually expensive for the market. The building is the largest in the Western Hemisphere and was designed by David Childs of Skidmore, Owings & Merrill after an initial concept was developed in Daniel Lieskind's master plan for the site.

Meanwhile, developer Larry Silverstein is still contemplating building an office tower named 3 World Trade on the site, after completing the 2.3 million-sf 4 World Trade (opened last fall and now 51% leased). Insiders now doubt that the Port Authority will approve Silverstein's proposed deal in light of questions about the match between available space and potential demand.

 

 

Related Stories

| Sep 11, 2012

McQuade appointed CEO of Tishman Construction

McQuade will focus on driving the growth of the company into new markets and expanding market share in its current areas of operation.

| Sep 11, 2012

Ecosystem Management & Associates joins HDR

EM&A staff will do business as part of HDR Engineering and HDR Environmental, Operations and Construction.

| Sep 10, 2012

Specialty door types—plenty of functional variety

In the MasterFormat section 08 30 00, Specialty Doors and Frames, a number of door types are listed for special functions, access locations, sliding and folding hardware, and even pressure-resistant types.

| Sep 7, 2012

7 Do's and Don'ts for PV roof rack installation

As PVs grow in popularity, nearly half of all installations require roof rack systems. Our expert tells how to do the job right and protect your client’s roof.

| Sep 7, 2012

Net-zero energy pioneers on the el-hi frontier

Getting to net-zero is not easy, but the promise of eliminating energy bills and using state-of-the-art technology as a learning lab can make a compelling case to reach for net-zero.

| Sep 7, 2012

Healthcare architects get a preview of tomorrow’s medical landscape

The topic on everyone’s mind was how the Affordable Care Act would impact healthcare design and construction––and whether the law would even make it past the coming election cycle.

| Sep 7, 2012

Goettsch Partners designs new tower in Abu Dhabi

Al Hilal Bank’s 24-story flagship development provides contemporary office space.

| Sep 7, 2012

Suffolk awarded One Channel Center project in Boston

Firm to manage $125 million, 525,000-sf office building project.

| Sep 7, 2012

Duffy joins Thornton Tomasetti

At Hardesty & Hanover, Duffy partnered with Thornton Tomasetti on a number of projects.

| Sep 7, 2012

Lucile Packard Children’s Hospital breaks ground on expansion

Sustainability and nature at the heart of the new addition at the Stanford University Medical Center designed by Perkins+Will.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021