flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

One World Trade Center cuts rents due to sluggish activity

One World Trade Center cuts rents due to sluggish activity

WSJ reports that no private tenant has signed a lease in the iconic tower for nearly three years.


By BD+C Staff | May 27, 2014
One World Trade Center, courtesy Cushman & Wakefield
One World Trade Center, courtesy Cushman & Wakefield

One World Trade Center, soaring to 1,776 feet and set to open by year's end, is having difficulty attracting tenants, according to a report in the Wall Street Journal.

Developer The Durst Organization and the Port Authority of New York and New Jersey have reduced asking rents for larger tenants to $69/sf, down from $75.

The 3.1 million-sf project—originally known as Freedom Tower—is reportedly the most expensive office tower ever built, at a construction cost of $3.9 billion. It is currently about 55% leased, according to the Wall Street Journal. Current large deals in downtown New York City have been made in the $50 to $60/sf range, making One World Trade unusually expensive for the market. The building is the largest in the Western Hemisphere and was designed by David Childs of Skidmore, Owings & Merrill after an initial concept was developed in Daniel Lieskind's master plan for the site.

Meanwhile, developer Larry Silverstein is still contemplating building an office tower named 3 World Trade on the site, after completing the 2.3 million-sf 4 World Trade (opened last fall and now 51% leased). Insiders now doubt that the Port Authority will approve Silverstein's proposed deal in light of questions about the match between available space and potential demand.

 

 

Related Stories

| Feb 17, 2014

GBI to Offer AIA Approved Course Free for 60 Days to Train New Green Globes Professionals

The Green Building Initiative™ (GBI) announced today that between Feb. 13 and April 15 it will provide free access to its online certification course for Green Globes Professionals™ (GGPs). GGPs help guide building projects in achieving Green Globes® ratings, awarded for environmentally-focused design and construction.

| Feb 14, 2014

ASHRAE, Green Grid team up on energy-efficiency guide for data centers

Vendor-neutral publication examines aspects of the popular power usage effectiveness (PUE) metric.

| Feb 14, 2014

Scrap tires used to boost masonry blocks at Missouri University of S&T

Research could lead to blocks that use waste material and have seismic and insulating benefits.

| Feb 14, 2014

Giant interactive pinwheel adds fun to museum exterior

The proposed design for the Santa Cruz Museum of Art and History features a 10-foot pinwheel that can be activated by passersby.

| Feb 14, 2014

First look: Kentucky's Rupp Arena to get re-clad as part of $310M makeover

Rupp Arena will get a 40-foot high glass façade and a new concourse, but will retain many of its iconic design elements.

| Feb 14, 2014

Must see: Developer stacks shipping containers atop grain silos to create student housing tower

Mill Junction will house up to 370 students and is supported by 50-year-old grain silos.

| Feb 14, 2014

The Technology Report 2014: Top tech tools and trends for AEC professionals

In this special five-part report, Building Design+Construction explores how Building Teams throughout the world are utilizing advanced robotics, 3D printers, drones, data-driven design, and breakthroughs in building information modeling to gain efficiencies and create better buildings. 

| Feb 14, 2014

Crowdsourced Placemaking: How people will help shape architecture

The rise of mobile devices and social media, coupled with the use of advanced survey tools and interactive mapping apps, has created a powerful conduit through which Building Teams can capture real-time data on the public. For the first time, the masses can have a real say in how the built environment around them is formed—that is, if Building Teams are willing to listen.

| Feb 13, 2014

University officials sound off on net zero energy buildings

As part of its ongoing ZNE buildings research project, Sasaki Associates, in collaboration with Buro Happold, surveyed some 500 campus designers and representatives on the top challenges and opportunities for achieving net-zero energy performance on university and college campuses. 

| Feb 13, 2014

3 keys to designing freestanding emergency departments

Having physically disassociated from a central hospital, FEDs must overcome the particular challenges associated with a satellite location, namely a lack of awareness, appeal, and credibility. Gresham, Smith & Partners' Kristin Herman-Druc offers three keys to success. 

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021