flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

One World Trade Center cuts rents due to sluggish activity

One World Trade Center cuts rents due to sluggish activity

WSJ reports that no private tenant has signed a lease in the iconic tower for nearly three years.


By BD+C Staff | May 27, 2014
One World Trade Center, courtesy Cushman & Wakefield
One World Trade Center, courtesy Cushman & Wakefield

One World Trade Center, soaring to 1,776 feet and set to open by year's end, is having difficulty attracting tenants, according to a report in the Wall Street Journal.

Developer The Durst Organization and the Port Authority of New York and New Jersey have reduced asking rents for larger tenants to $69/sf, down from $75.

The 3.1 million-sf project—originally known as Freedom Tower—is reportedly the most expensive office tower ever built, at a construction cost of $3.9 billion. It is currently about 55% leased, according to the Wall Street Journal. Current large deals in downtown New York City have been made in the $50 to $60/sf range, making One World Trade unusually expensive for the market. The building is the largest in the Western Hemisphere and was designed by David Childs of Skidmore, Owings & Merrill after an initial concept was developed in Daniel Lieskind's master plan for the site.

Meanwhile, developer Larry Silverstein is still contemplating building an office tower named 3 World Trade on the site, after completing the 2.3 million-sf 4 World Trade (opened last fall and now 51% leased). Insiders now doubt that the Port Authority will approve Silverstein's proposed deal in light of questions about the match between available space and potential demand.

 

 

Related Stories

Sponsored | | May 27, 2014

Grim Hall opens the door to fire safety with fire-rated ceramic glass

For the renovation of Lincoln University’s Grim Hall life sciences building into a state-of-the-art computer facility, Tevebaugh Associates worked to provide students and faculty with improved life safety protection. Updating the 1925-era facility's fire-rated doors was an important component of the project. 

| May 26, 2014

New Jersey data centers will manage loads with pods

The two data center facilities totaling almost 430,000 sf for owner Digital Realty Trust will use the company's TK-Flex planning module, allowing for 24 pods.

| May 23, 2014

Big design, small package: AIA Chicago names 2014 Small Project Awards winners

Winning projects include an events center for Mies van der Rohe's landmark Farnsworth House and a new boathouse along the Chicago river.

| May 23, 2014

Top interior design trends: Gensler, HOK, FXFOWLE, Mancini Duffy weigh in

Tech-friendly furniture, “live walls,” sit-stand desks, and circadian lighting are among the emerging trends identified by leading interior designers. 

| May 22, 2014

How to measure what matters

Measuring what matters is essential for professional services firms, says author and consultant Tim Williams, particularly as firms continue to experiment with the concept of outcome-based compensation agreements.  

| May 22, 2014

BIM-driven prototype turns data centers into a kit of parts

Data center design specialist SPARCH creates a modular scheme for solutions provider Digital Realty.

| May 22, 2014

7 ways it pays to use BIM for data centers

Here’s where AEC firms and owners are getting the most bang for the buck when using BIM/VDC to coordinate data center projects.

| May 22, 2014

No time for a trip to Dubai? Team BlackSheep's drone flyover gives a bird's eye view [video]

Team BlackSheep—devotees of filmmaking with drones—has posted a fun video that takes viewers high over the city for spectacular vistas of a modern architectural showcase.

| May 22, 2014

NYC's High Line connects string of high-profile condo projects

The High Line, New York City's elevated park created from a conversion of rail lines, is the organizing principle for a series of luxury condo buildings designed by big names in architecture.

| May 22, 2014

Just two years after opening, $60 million high school stadium will close for repairs

The 18,000-seat Eagle Stadium in Allen, Texas, opened in 2012 to much fanfare. But cracks recently began to appear throughout the structure, causing to the school district to close the facility. 

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021