flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

One Hundred Above the Park completes in St. Louis

Multifamily Housing

One Hundred Above the Park completes in St. Louis

Studio Gang designed the building.


By David Malone, Associate Editor | March 23, 2021
One Hundred Above the Park on the skyline at dusk

Photos: Sam Fentress

Clayco has recently completed construction on One Hundred Above the Park, a new 385-foot-tall, 518,000-sf residential tower overlooking St. Louis’s Forest Park.

The 36-story, 316-unit tower features a scalloped facade and leaf-shaped floor plates. One floor was completed per week through the use of a specialized concrete mixture that cures faster than traditional materials. The curtain-wall glass on an upper floor was installed simultaneously with metal panel walls on the floors below.

Amenities include a pool deck, a fitness center, common areas, retail space, and six floors of parking. The angled glass facade improves energy efficiency and each apartment features a corner living room with double exposures.

The Studio Gang-designed project is owned and developed by Mac Properties.

 

One Hundred Above the Park facade

 

ONe Hundred in the Park facade from below

Related Stories

| Jan 19, 2020

Pioneer introduces new Lux-Flow showerhead

Pioneer Industries has launched the Pioneer Lux-Flow showerhead.

| Dec 18, 2019

Making contacts that lead to "true partnerships" is key to Student Housing ProCONNECT event for Pfister's Tracey Qualteri

Tracey Qualteri, Pfister Faucets, at Student Housing ProConnect in Denver, November 11 2019

Multifamily Housing | Dec 11, 2019

8 noteworthy multifamily projects to open in late 2019

From a prefab high-rise in Denver to a seaside village in Oxnard, Calif., these projects highlight the innovative multifamily developments to open their doors in late 2019.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021