flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

OMA unveils design for the Netherlands' largest hotel

Hotel Facilities

OMA unveils design for the Netherlands' largest hotel

The building will also house a television studio and art gallery.


By BD+C Staff | April 29, 2015
OMA unveils design for the Netherland’s largest hotel

Once completed, and if approved, the structure will add three stacked cubes to the Amsterdam skyline. Renderings courtesy OMA

Designs by OMA for an approximately 300-foot-tall, 650-room hotel in Amsterdam—poised to be the Netherland’s largest hotel—have been released.

According to ArchDaily, OMA’s design was chosen ahead of eleven firms. Once completed, and if approved, the structure will add three stacked cubes to the Amsterdam skyline.

In addition to the Nhow Hotel Rai, the building’s main occupant, the project will also have a television studio, art gallery, spa center, sculpture garden, a multimedia presentation space, a lounge and bar on the 25th floor, and something that developers call a “3D holographic meeting space.”

The designs were unveiled after the project’s 15-year brainstorm process. Before OMA’s recently released design, a larger 800-room scheme was rejected by the city a few years ago.

ArchDaily has more on the story.

 

Related Stories

| Sep 26, 2011

Energy efficient LED flat panels installed at N.Y. metro hospitals

LED Flat Panels deliver fully dimmable, energy efficient high quality lighting with even, shadow-free distribution, and excellent 85 Color Rendering Index. 

| Sep 23, 2011

Curtainwall façade installation at Ohio State Cancer and Critical Care facility

A sophisticated curtainwall facade will be installed at the new OSU Cancer and Critical Care facility.

| Sep 14, 2011

Insulated metal wall panels adorn Pennsylvania hospital

The $40 million, 80,000 sf medical office building includes more than 7,000 sf of architectural flat insulated metal wall panels.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 7, 2011

KLMK Group awarded contract with Louisiana’s Slidell Memorial Hospital

The renovation will include a 56,000-sf Emergency Room/Cardiology Expansion.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021