flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Office vacancy peak of 22% to 28% forecasted for 2026

Office Buildings

Office vacancy peak of 22% to 28% forecasted for 2026

Office landlords face between $8 billion and $10 billion loss of revenue


By Peter Fabris, Contributing Editor | July 8, 2024
Image by Sergey from Pixabay

Image by Sergey from Pixabay

The work from home trend will continue to put pressure on the office real estate market, with peak vacancy of between 22% and 28% in 2026, according to a forecast by Moody’s.

“The discourse around the purported benefits of in-office work, emphasized by some CEOs, has been prominent in the media,” Moody’s says. “Nevertheless, the argument for maintaining or even increasing remote work practices remains compelling for many businesses. If productivity remains stable and costs can be reduced by forgoing physical office spaces, the rationale for mandating in-office attendance diminishes.”

The base model forecast indicates that the impact on office demand from work from home will be around 14% on average across a 63-month period, resulting in vacancy rates that peak in early 2026 at approximately 24% nationally, Moody’s says. The vacancy rate could reach as high as 28% in the highest-case scenario.

Moody’s forecasts that higher vacancy rates will cut revenue for office landlords by between $8 billion and $10 billion by 2026. That could cause property value deterioration in the range of a quarter-trillion dollars.

Related Stories

| Mar 4, 2013

Korean Air, AC Martin collaborating on Western region's tallest tower

The 1,100-foot Wilshire Grand will combine retail and restaurant space, offices, and a luxury hotel in the sky.

| Mar 3, 2013

Hines acquires Archstone's interest in $700 million CityCenterDC project

The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.

| Feb 28, 2013

Greeening Silicon Valley: Samsung's new 1.1 million-sf HQ

Samsung Electronics' new 1.1 million sf San Jose campus will support at least 2,500 sales and R&D staff in the company's semiconductor and display businesses.

| Feb 26, 2013

Tax incentive database for reflective roofs available

The Roof Coatings Manufacturers Association (RCMA) and the Database of State Incentives for Renewables & Efficiency (DSIRE) created a database of current information on rebates and tax credits for installing reflective roofs.

| Feb 25, 2013

First look: Google's new HQ is engineered for creative collisions

The new California "Googleplex" will be engineered to make sure no Google employee will be more than a 2.5 minute walk away from any other.

| Feb 25, 2013

10 U.S. cities with the best urban forests

Charlotte, Denver, and Milwaukee are among 10 U.S. cities ranked recently by the conservation organization American Forests for having quality urban forest programs.

| Feb 22, 2013

Westlake Reed Leskosky will renovate training center for Cleveland Browns

Local firm Westlake Reed Leskosky has been chosen to design renovations to the Cleveland Browns' Training and Administrative Complex in Berea, Ohio.

| Feb 21, 2013

Holl videos discuss design features of Chengdu ' Porosity Block' project

Architect Steven Holl has released two short films describing the development of Sliced Porosity Block in Chengdu, China.

| Feb 21, 2013

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia.

boombox1
boombox2
native1

More In Category


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021