flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Office space downsizing trend appears to be past peak

Office Buildings

Office space downsizing trend appears to be past peak

Just 37% of companies plan to shrink space this year versus 57% last year.


By Peter Fabris, Contributing Editor | September 5, 2024
Office space downsizing trend appears to be past peak Image by Pexels from Pixabay

Image by Pexels from Pixabay

The office space downsizing trend may be past its peak, according to a CBRE survey of 225 companies with offices in the U.S., Canada, and Latin America.

Just 37% of companies plan to shrink their office space this year compared to 57% last year, the survey found. In addition, more companies plan to expand their office space over the next several years with 38% planning to do so, compared to 20% a year ago.

Some companies may have trimmed too much space in recent years, CBRE says.

“An 18-percentage-point, year-over-year increase in companies anticipating expansion of their office footprints is a significant step toward a return to growth,” says Manish Kashyap, CBRE Global President of Advisory & Transaction Services. “It bodes well for a U.S. office market, which has faced many challenges in recent years. There remains a segment of demand where companies are opting to renew their leases to forego the costs of moving, but there is now a change in sentiment favoring expansion.”

Most companies say office attendance is holding steady. Companies looking to relocate are interested in upgraded space, such as a better location, better quality space or improved employee experience.

Related Stories

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 18, 2014

First international buildings among 700-plus certified by BOMA 360 Performance Program

In the first quarter of 2014, the Building Owners and Managers Association (BOMA) International certified 66 properties in the BOMA 360 Performance Program for commercial real estate markets across the U.S and, for the first time, abroad.

| Apr 16, 2014

Upgrading windows: repair, refurbish, or retrofit [AIA course]

Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.

| Apr 15, 2014

12 award-winning structural steel buildings

Zaha Hadid's Broad Art Museum and One World Trade Center are among the projects honored by the American Institute of Steel Construction for excellence in structural steel design.

| Apr 15, 2014

Chipperfield's sparkling brass-clad scheme selected to be new home of Nobel Prize

The distinctive building, with its shimmering vertical brass elements and glass façade design, beat out two other finalists in the Nobel Center architectural competition.

| Apr 11, 2014

ULI report documents business case for building healthy projects

Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.

| Apr 11, 2014

First look: KPF's designs for DreamWorks in the massive Shanghai DreamCenter

Two blocks of offices will be centerpiece of new cultural and lifestyle district in the West Bund Media Port.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 31, 2014

Removable flood prevention system installed in one of New York City's largest office buildings

EKO Flood Protection created a flood prevention solution for one of New York City's largest office buildings, 55 Water Street, that can be put up in 8 hours by a crew of 30 people. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021