flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Office space downsizing trend appears to be past peak

Office Buildings

Office space downsizing trend appears to be past peak

Just 37% of companies plan to shrink space this year versus 57% last year.


By Peter Fabris, Contributing Editor | September 5, 2024
Office space downsizing trend appears to be past peak Image by Pexels from Pixabay

Image by Pexels from Pixabay

The office space downsizing trend may be past its peak, according to a CBRE survey of 225 companies with offices in the U.S., Canada, and Latin America.

Just 37% of companies plan to shrink their office space this year compared to 57% last year, the survey found. In addition, more companies plan to expand their office space over the next several years with 38% planning to do so, compared to 20% a year ago.

Some companies may have trimmed too much space in recent years, CBRE says.

“An 18-percentage-point, year-over-year increase in companies anticipating expansion of their office footprints is a significant step toward a return to growth,” says Manish Kashyap, CBRE Global President of Advisory & Transaction Services. “It bodes well for a U.S. office market, which has faced many challenges in recent years. There remains a segment of demand where companies are opting to renew their leases to forego the costs of moving, but there is now a change in sentiment favoring expansion.”

Most companies say office attendance is holding steady. Companies looking to relocate are interested in upgraded space, such as a better location, better quality space or improved employee experience.

Related Stories

Office Buildings | Jun 18, 2018

Cube-shaped AmorePacific headquarters building completes construction in Seoul

The David Chipperfield Architects-designed project began in 2010.

Office Buildings | Jun 15, 2018

Portland’s newest office buildings put nature on center stage

Hacker Architects designed the space for Portland’s Frontside District.

Office Buildings | Jun 11, 2018

Online travel company moves to the 66th floor of the Empire State Building

The new headquarters includes almost 20,000 sf of additional space.

Office Buildings | Jun 6, 2018

Final Cut: Jupiter Entertainment’s new production studio in New York combines office and editing spaces

The project team completed this full-floor renovation in four months.

Office Buildings | May 31, 2018

EarthCam Headquarters features a 25-foot-tall video portal entrance

Watch a time-lapse of the HQ being built from groundbreaking to grand opening.

| May 30, 2018

Accelerate Live! talk: T3 mass timber office buildings

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), architect and mass timber design expert Steve Cavanaugh tells the story behind the nation’s newest—and largest—mass timber building: T3 in Minneapolis.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Office Buildings | May 22, 2018

Where fun follows function: New study reemphasizes the value of play in the workplace

Perkins Eastman recommends personalization, access and “linkages,” and variety as design criteria.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021