flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Office renovation and addition give new life to a section of Huntsville, Ala.

Office Buildings

Office renovation and addition give new life to a section of Huntsville, Ala.

The newly opened Freedom Center, near Redstone Arsenal, includes a 10,000-sf conference center.


By John Caulfield, Senior Editor | March 2, 2017

The Freedom Center in South Huntsville, Ala., is an office complex that is seen as part of the revitalization of that part of the city. Torch Technologies, the building's anchor tenant, spearheaded the redevelopment. Image: J. Hanshaw Photography

In late January, Turner Construction completed the three-phase Freedom Center, a new office complex that is part of the revitalization of South Huntsville, Ala.

The project, designed by Matheny Goldmon Architecture + Interiors and estimated at between $10 million and $12 million, is a multi-tenant facility where its anchor, Torch Technologies, a defense contractor, now operates its corporate headquarters.

Torch’s sister company, Freedom Real Estate and Capital, cleared the path for the steel-framed Freedom Center last year by acquiring two office buildings as well as approximately 12 surrounding acres of land. The Freedom Center is positioning itself to be a hub for business close to Alabama’s Redstone Arsenal.

Torch received a $2.1 million incentive package to stay in Huntsville and redevelop these properties from the city, the state of Alabama, and the Tennessee Valley Authority, according to the Alabama Media Group’s website. It also received tax abatements and grants, and $250,000 from the state as reimbursement for capital expenditures, AIDT-provided workforce training, and the capital income tax credit.

 

 

The schematic of Freedom Center's main level shows what's been upgraded during its three-phase renovation. Image: Courtesy of Freedom Real Estate and Capital

 

The three-phase Freedom Center project included the renovation of a 40,000-sf four-story building at 4090 South Memorial Parkway, which was completed in October 2015. Phase 2 involved the construction of a one-story 12,000-sf building, which connects two existing properties developed by Freedom Real Estate and Capital. This new building features office and training spaces, as well as a 10,000-plus-sf conference center.

Phase 3 replaced the building’s HVAC system, refurbished its lobby and elevators, and replaced the roof on the four-story building a 4035 Chris Drive.

“This is a significant project for Huntsville. Companies like Freedom Real Estate are increasingly investing in the redevelopment of the area,” said Lee Holland, project executive in Turner’s Huntsville office and a native of the city. “We’re thankful to have played a small role in those efforts with the construction and renovations at the Freedom Center.”

Bill Roark, CEO of Torch Technologies & Freedom Real Estate & Capital added that the Freedom Center’s name is meant to honor  “the many military members, as well as civilians, who fight and work every day to keep our country free.”

Other Building Team members on this project included 4 Site Incorporated, PEC Structural Engineering, and SSOE Group.

New Live-Work-Shop complex moving forward

Another major project that appears to have picked up momentum in downtown Huntsville is Constellation, a $180 million live-work-shop complex that would include restaurants and retail, 150 apartments, 280,000 sf of office space, a new hotel, and two parking decks.

This project was first conceived in 2000 but got waylaid during the last recession. But developer Scott McLain, of Coldwell Commercial Real Estate and McLain Real Estate, tells al.com that he has a “firmly established and functioning partnership” for this project, which he claims is now in “full development.”

Groundbreaking for Constellation could take place in a few months, said McLain.

 

Related Stories

Energy-Efficient Design | Jun 5, 2023

Implementing an ‘asset drawdown strategy’ for site decarbonization

Solidifying a decarbonization plan via an “asset drawdown strategy” that carefully considers both capital and operating costs represents a game-changing opportunity for existing properties to compete with new projects.

Office Buildings | Jun 5, 2023

Office design in the era of Gen Z, AI, and the metaverse

HOK workplace and interior design experts Kay Sargent and Tom Polucci share how the hybrid office is evolving in the era of artificial intelligence, Gen Z, and the metaverse.

Urban Planning | Jun 2, 2023

Designing a pedestrian-focused city in downtown Phoenix

What makes a city walkable? Shepley Bulfinch's Omar Bailey, AIA, LEED AP, NOMA, believes pedestrian focused cities benefit most when they're not only easy to navigate, but also create spaces where people can live, work, and play.

Mixed-Use | Jun 1, 2023

The Moore Building, a 16-story office and retail development, opens in Nashville’s Music Row district

Named after Elvis Presley’s onetime guitarist, The Moore Building, a 16-story office building with ground-floor retail space, has opened in Nashville’s Music Row district. Developed by Portman and Creed Investment Company and designed by Gresham Smith, The Moore Building offers 236,000 sf of office space and 8,500 sf of ground-floor retail. 

Office Buildings | May 24, 2023

The future of work: What to expect in 2023

While no one disagrees that the workplace has undergone tectonic changes, it is less clear how to understand these shifts and synthesize them into practical action for the coming year.

Multifamily Housing | May 23, 2023

One out of three office buildings in largest U.S. cities are suitable for residential conversion

Roughly one in three office buildings in the largest U.S. cities are well suited to be converted to multifamily residential properties, according to a study by global real estate firm Avison Young. Some 6,206 buildings across 10 U.S. cities present viable opportunities for conversion to residential use.

Headquarters | May 16, 2023

Workplace HQ for party clothing company Shinesty celebrates its bold, whimsical products

The new Denver headquarters for Shinesty, a party clothing company, was designed to match the brand’s fun image with an iconic array of colors, textures, and prints curated by the design agency, Maximalist. Shinesty’s mission, to challenge the world to live more freely and “take itself less seriously,” is embodied throughout the office interior.

Office Buildings | May 15, 2023

Sixteen-story office tower will use 40% less energy than an average NYC office building

This month marks the completion of a new 16-story office tower that is being promoted as New York City’s most sustainable office structure. That boast is backed by an innovative HVAC system that features geothermal wells, dedicated outdoor air system (DOAS) units, radiant heating and cooling, and a sophisticated control system to ensure that the elements work optimally together.

Headquarters | May 15, 2023

The new definition of Class A property

Dan Cheetham, Managing Director and Founder of FYOOG, believes organizations returning to a "hub and spoke" model could have a profound effect on properties once considered Class B.

Headquarters | May 9, 2023

New Wells Fargo development in Texas will be bank’s first net-positive campus

A new Wells Fargo development in the Dallas metroplex will be the national bank’s first net-positive campus, expected to generate more energy than it uses. The 850,000-sf project on 22 acres will generate power from solar panels and provide electric vehicle charging stations.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021