flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Office developers aim for zero carbon without offsets

Codes and Standards

Office developers aim for zero carbon without offsets

Some companies searching for office space make net zero carbon a requirement.


By Peter Fabris, Contributing Editor | July 22, 2022
Office Development
Courtesy Pixabay.

As companies reassess their office needs in the wake of the pandemic, a new arms race to deliver net zero carbon space without the need for offsets is taking place in London, according to a recent Bloomberg report.

Dutch developer Edge, for example, recently committed to reach absolute zero carbon on its new developments by at least 2050. Its future projects will eventually be built and operated in a way that requires no tree planting to mitigate their impact. Australia’s Lendlease Corp. and Copenhagen-based Nordic Real Estate Partners A/S have made similar pledges.

If the firms achieve that goal, they will outpace net-zero developments being promoted by many of Europe’s largest landlords that require offsets to reach zero-carbon goals. Edge will continue to build projects that include offsets for now as it seeks to build more sustainable buildings that won’t need any offsets to reach net-zero.

Edge plans to immediately reduce embodied emissions for any new projects by at least 50%. That would mean a maximum upfront embodied carbon target of 500 kilograms of CO2 for each square meter.

Related Stories

| Oct 3, 2013

Arizona utility pushes for change in building codes to boost efficiency on all commercial projects

Many large construction projects in Arizona are going green by paying attention to energy efficiency, but smaller buildings that are often rented out haven't yet jumped on the bandwagon.

| Oct 3, 2013

Bipartisan energy efficiency bill stalled; may not be revived this year

The Senate spent the first two weeks of September trying to pass bipartisan energy efficiency legislation, commonly known as Shaheen-Portman (S. 1392) that would have impacted building codes.

| Oct 3, 2013

LEED credential exams will feature LEED v4 material beginning next spring

The LEED Professional Credential exams for the LEED Green Associate and LEED AP with specialty designations will feature LEED v4 material beginning in late spring 2014.

| Sep 26, 2013

Ballot period on National CAD Standards open until Oct. 13

The Ballot Comment Period to update the nation’s leading computer-aided design (CAD) standard is now open.

| Sep 26, 2013

OSHA encourages comments on respirable crystalline silica rules

The Occupational Safety and Health Administration’s proposed rulemaking for respirable crystalline silica has been published in the Federal Register.

| Sep 26, 2013

EPA’s final rule on updated ASTM standard likely to be withdrawn

The Environmental Protection Agency is expected to withdraw a direct final ruleissued in Augustregarding an ASTM standard for Phase I Environmental Site.

| Sep 26, 2013

A primer on RoofPoint green-rating system for commercial roofs

The RoofPoint green-rating system can be used to construct more energy-efficient and sustainable commercial roofs.

| Sep 26, 2013

ConsensusDocs releases updated federal subcontract to help construction firms perform federal work

The newly revised ConsensusDocs standard subcontract (ConsensusDocs 752 for federal work) will make it easier for general contractors and subcontractors to perform federal work.

| Sep 18, 2013

Proposed Boston casino development approval will depend partly on sustainability

The movement toward green building has been slow to catch on in the casino industry, but that could change with Suffolk Downs, which plans to build a $1 billion casino in Boston.

| Sep 18, 2013

Regulations could ease firefighters’ fear of roof solar panels

The local fire chief says solar panels are partly to blame after a 300,000 sf refrigerated warehouse in Delanco, N.J., burned down.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021