flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Office developers aim for zero carbon without offsets

Codes and Standards

Office developers aim for zero carbon without offsets

Some companies searching for office space make net zero carbon a requirement.


By Peter Fabris, Contributing Editor | July 22, 2022
Office Development
Courtesy Pixabay.

As companies reassess their office needs in the wake of the pandemic, a new arms race to deliver net zero carbon space without the need for offsets is taking place in London, according to a recent Bloomberg report.

Dutch developer Edge, for example, recently committed to reach absolute zero carbon on its new developments by at least 2050. Its future projects will eventually be built and operated in a way that requires no tree planting to mitigate their impact. Australia’s Lendlease Corp. and Copenhagen-based Nordic Real Estate Partners A/S have made similar pledges.

If the firms achieve that goal, they will outpace net-zero developments being promoted by many of Europe’s largest landlords that require offsets to reach zero-carbon goals. Edge will continue to build projects that include offsets for now as it seeks to build more sustainable buildings that won’t need any offsets to reach net-zero.

Edge plans to immediately reduce embodied emissions for any new projects by at least 50%. That would mean a maximum upfront embodied carbon target of 500 kilograms of CO2 for each square meter.

Related Stories

| Jan 31, 2013

The Opus Group completes construction of corporate HQ for Church & Dwight Co.

The Opus Group announced today the completion of construction on a new 250,000-square-foot corporate headquarter campus for Church & Dwight Co., Inc., in Ewing Township, near Princeton, N.J.

| Jan 31, 2013

More cities requiring large buildings to use EPA’s energy management and reporting

In 2012, Philadelphia joined several other U.S. cities in passing a requirement that large buildings use Portfolio Manager, the Environmental Protection Agency’s energy management tool, to measure and report energy performance.

| Jan 29, 2013

Astellas' New Headquarters for the Americas Earns LEED Gold Certification

The new headquarters for Astellas in the Americas in Northbrook, Ill., has been awarded LEED Gold certification by the USGBC.

| Jan 16, 2013

SOM’s innovative Zhengzhou Greenland Plaza opens

The 2.59-million-square-feet building houses a mixed-use program of offices on its lower floors and a 416-room hotel.

| Dec 9, 2012

The owner’s perspective: high-rise buildings

Douglas Durst on the practicalities of development: “You must think about a building from the inside out.”

| Nov 28, 2012

Project team to showcase design for first mixed-use retail center of its kind in Mexico City

Project reaching construction milestone, offering national model for urban development in Mexico.

| Nov 6, 2012

Goettsch Partners designs new tower in Shunde, China

200-meter-tall building will be located between Guangzhou and Hong Kong.

| Nov 1, 2012

Greenbuild 2012 Report: Green Architecture Firms

Design firms deliver gold, platinum, even net-zero projects

| Oct 17, 2012

Denver office building makes use of single-component wall system for retrofit

The Building Team selected Centria's Formawall Dimension Series to help achieve the retrofit project's goals of improved aesthetics, sustainability, and energy efficiency.

boombox1
boombox2
native1

More In Category

Office Buildings

Unlocking Sustainability: Smart Access in the Coworking Space

Smart building technologies, including modern access control systems, are transforming coworking spaces by advancing sustainability initiatives and offering new ways to create and operate efficient working spaces. Learn more about the benefits of eco-friendly practices, from reducing carbon emissions to cutting operating costs, and discover 
how choosing the right partners can amplify your green efforts.


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021